My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4122 COLBY AVE A B 2022-07-20
>
Address Records
>
COLBY AVE
>
4122
>
4122 COLBY AVE A B 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 11:01:50 AM
Creation date
7/20/2022 11:01:17 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4122
Unit
A B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> 2021 System Development Fee Calculations <br /> Permit#: PW2004-029 Additional Notes: <br /> Project Address: 4122 Colby AVE <br /> Project Name: New Duplex <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Thad Newport Date: 4/2/2021 I <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: SFR/Townhome Previous Bldg Use#1: SFR/Townhome Previous Bldg Use#2: No Other Use Previous Bldg Use#3: No Other Use <br /> ProposedUnit Measure: 1 Unit Unit Measure for Use#1: 1 Unit Unit Measure for Use#2: - None Unit Measure for Use#3: - None <br /> Note:Meter Size Used for Proposed Meter Size: 1" Credited Meter#1 Size: 3/4" Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $6,997.00 Water Credit#1: $4,190.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> Sewer Fee: $9,055.00 Sewer Credit#1: $5,422.00 Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: $2,807.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $3,633.00 This fee reflects credit for existing water meter <br /> Total: $6,440.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: $0.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#: PW2004-029 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 1,998 SF <br /> Stormwater System Dev Fee: $526.07 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.