Laserfiche WebLink
/ BEAM PER PLAN <br />2x6 FULL HEIGHT, <br />I \ CRIPPLE EACH SIDE W <br />(�) ROY45 16d 51NKER5 <br />4" O.G. STAGGERED <br />\ 2" FROM EDGE TO 24" <br />DELOIN BEAM <br />NOTE: GUARDS SHALL BE DESIGNED TO SUPPORT <br />SINGLE CONCENTRATED LOAD OF 2001b IN ANY � <br />DIRECTION/POINT PER I .R.G. TABLE 501.5 <br />I Y4"x2" CONT. HANDRAIL � \® <br />V4" dia. MIN. HANDRAIL, CONTINUOUS FOR FULL LENGTH OF STAIR <br />(NOTE: HANDRAIL GRIP 51ZE PER I.R.C. 111.63)` - <br />{2)Ya"x l Y�" STEEL POST PER ' LN ' �°(�fi��'", USA I <br />HANDRAILS PER I.R.C. R511.`�.5 Ind NAILS ®�" ®.G: <br />NOTE: SPACING BETlNEEN I NTERMED I ATE HORIZONTAL STEEL <br />5ALU5TER5 PER MANUF. MIN. <br />GUARDRAIL MEMBERS TO BE SUCH THAT _ - <br />A SPHERE OF 4" dia. SHALL NOT PA55 /� S Y�" SPACING ETlNEEN <br />THROUGH ANY OPENING / BALUSTERS TO CONFORM --BEAM DETAIL <br />II 11 ; / TO I.R.C.R312.1.5. <br />I Y4x2 CONT, - �(:2y:2"XIJ/ <br />- -- - -_- --- - ---- -- -- SCALE: NOT TO ALE <br />HANDRAILSTEELY"5" A�iLAG <br />Y�10 BHS <br />FRAMING 4 FND. DIM. <br />" CONCRETE <br />ALE: I" © 1'-0" <br />FRAM $ FNr-. DINT. <br />(PRESCRIPTIVE) <br />(2)#2 Y�"x5" PER PLAN STAGGE �, UUMD <br />-5O7 LAG SGREl� -_ -- TO FRAMING - <br />FINISH PER ELEVATION I <br />I SHEAR WALL PER <br />1 - n A- PLAN 4 SCHEDULE <br />- - - - BUILDING LINE BEYOND OVER HOUSE l�dR�,P <br />/ /--- - - - - - - - OVER SHEATHING PER I — ®®®— —®,1 --- PLAN <br />- � - - II } r 2x STUD <br />PLAN <br />S PER <br />,- TURN DOVdN SL,��NGHOR BOLTS PER <br />® 5 " MIN. 5TA I RNAY /% I I <br />INTO CONT. F®®TING Z FLASHING FND. PLAN OR <br />® 1 I !NI DTH PER I .R.C. 511,i,1 / <br />\�,\ i ;' ` \`h,. 2x !NOOD TRIM STRUCTURAL NOTES <br />p cv _� I ( / / - «R BEAM OR FLOOR � / ,,, PER PLAN <br />P.T. MUD -SILL PER <br />i <br />SYSTEM PER PLAN f <br />m O <br />' / �,I (OPTIONAL) I.R.C. R404.5 <br />!U ( ( " ® ® a..4 BAR HORIZ. PER <br />2 Y x 1 Y STEEL -- -� y ®, 11 <br />I /lu 7�F 71,- �� _ I .R.C. R405.1.5.1 I ! <br />YY STEEL PLATE /\\ \ \ \ \ �,Id <br />^._- --- --- - /i a //////�/" TIGHTLINE \/ <br />� - t SIMPSON �5� � Ems. SIDE ' /��- �� <br />(2)2 Y2x5 / / OR L 5�10 ON ONE SIDE \ STORM <br />- ASOi LAG SGPEW /�:;, :. ®I �\/� m DRAIN IF ®6-I j \\ I -I I <br />• I I 4 /\/\/ 4 G®NC. SLAB <br />STAIR, INSTALL Y2" f r ® <br />G.N.5. ® CEILING 4 NALLS (�) 4 ��R� � s \\ \\\ <br />O2x CU 10" MIN. - ®I. , #4 BAR ® 45" <br />PER PLAN I' END (5) 2x12 STRINGERS " CONTINUOUS 11` __ 11 <br />16d 4" O.G, dia. PELF. FND, DRAIN w/ I ® v _� _ / O.C. w/ 4 H®® <br />2x4 THRUST BLOCK I CONT. FILTER MEMBRANE <br />3 � <br />- - _ FIRE BLK O 0 MID -SPAN <br />o <br />PE�w <br />JST, OR BLK'C� (5) TOE�NAlLS ® NOTE: GREATEST AND LEAST TREAD I �" pia. PERK. FND. � IN w1 #4 BAR HORIZ. PER <br />SLR. BELOW STRINGER TO THRUST BLOCK RISER SHALL NOT VARY MORE THAN 5/,," i GONT. FILTER MEMBRANE <br />(PER I.R.C. R�II.i.�.l R311,i..2) �II / el �11 I.R,C, R405.1.5.1 <br />I ' SOCK" AROUND PIPE <br />T I I/RAILI ' <br />. <br />I <br />SC LE. I I ® ®FLDOR/C !NL SPACE DEL®Vd SCALE: I I ®® SCALE: I" m I°®�" PRESCRIPTIVE <br />PRAMINO FND. DIM. FRAMIN6 4 FND. DIM.' <br />INSUL, PER PLAN 2x STUDS PER PLAN <br />SHEAR 1N LL PER 2x STUDS PER PLAN 5/4" `T. G. PLYV400D ; ' <br />SU�FL®OR, GLUED NAILED HOUSE lNRAP OVER 2x6 STUD LL <br />PLAN 4 SCHEDULE 5/4" T. G. PLYY400D TT INSUL. PER PLAN I BATT INSULATION i <br />FINISH PER ELEVATION SU FLOOR, GLUED 4 NA,ILED SHEAR 1NALL PER FLOOR J5T5. PER PLAN PER PLAN FLASHING FLANGE BATT INSULATION o <br />SIDING PER PLAN <br />OVER HOUSE NRAP I VFLOOR ­15TS. PER PLAN PLAN 4 SCHEDULE /4" T. G. PLYN®OD <br />OVER SHEATHING PER 6,N13, PER PLAN 5UE3FLOO ., GLUED <br />PLAN TT INSULATION PER PLANNAILED "Z" FLASHING PER <br />AT R PLAN INSULATION ®N PE <br />16d ® 4" O.C. 16d a 4" O.C. LAP JOI5T5 &J II M NUF. 5PEC5. <br />Z FLASHING IGd TOE®N,41L5 <br />ep FLOOR JOISTS <br />2x dN®OD TRIM PER '� <br />C. � 6 C. � PLAN PER PLAN <br />(OPTIONAL) <br />( <br />• P.T. MUD -SILL PER 4" CONC, SLAB < iI I P.T. MUD -SILL PER <br />o I R404.5 > ,; I.R.C. R4O4.5 2x BLOCK w/ BEAM PER PLAN TRIM PER <br />ELEVATIONS <br />164 T®E�NiLS ®.1I II 4 BAR HORIZ. PER �.- ®.I I II 16d TOE NAILS <br />" ® II •!1 - ® ® ®. ® I1 11' 4BAR HORIZ. PER - - 2x6xI2 CLEAT W <br />� � ®6 O.C. t 1 t 1 , x TO BEAM <br /><r \`a ° I.R.C. R4O5.1.5.1 d . d �; I.R.G. R405.1.5.1 (2) 16d NAILS INTO <br />° :1 ANCHOR BOLTS PER BEM (�) IGd <br />z � T16HTLINE / \ ANCHOR BOLTS PER < <br />FND. PLAN OR I FND. PLAN OR - ® P5 �R <br />STORM I ! , . NAILS INTO COLUMN <br />DRAIN IF \\ 5TRU6TURAL NOTES � � /\\'r\\/\\ �I; STRUCTURAL URAL NOTES � <br />LL_REO'D\// it 4 BAR HORIZ. PER ,/// // 11 4 BAR HORIZ. PER _ - APPROVED <br />EOU�iI P.T. POST PER PLAN <br />/ 11 ° \/\ O / 1 I ®PRO Y �F! <br />I I.R.C. R4O5.1,5.1 !I I.R.C. R4O5.1.5.1 <br />- / _ _ e (q MIL. BLACK <br />®!.• MIL,. BLACK V.B. --a �\ 91. G MIL. BLACK V. . '®. ° <br />_ ®,VAPOR BARP <br />- <br />4 bR 4 O.C. 4 �R ®4� °' <br />" dia. PERP. FND, DRAIN / II �II II N1 4" HOOK BITUMINOUS I O.C. w/ 4" HOOK / <br />GONT. FILTER MEMBRANE 51TUMlNOU� DAMP�PR®OFING DAMP®PROOFIN% TOP OF 561, <br />SOCK AROUND PIPE F, LTG. TO FINISH G \\�!4/(2) #4 BARS <br />TOP OPTGTO FINISH GE <br />DE I I CONTINUOUS <br />9 (JOiSTs PALLEL) <br />— <br />SCALE: I"i'—O" PRESCRIPTIVE SCALE: III 11-01" PRESCRIPTIVE 11 SCALE: 1" 11®0 <br />II NO 1NALL ® SIM. I, <br />SKYLIGHT SIZE PER <br />1 PLAN w/ 411 MIN. GURU SHEATH I NC 4 NAILING PER <br />FLSHPNGS 'S' SHEET STRUCTURAL NOTES <br />RECOMMENDED BY 2x6 BUILT-UP 2x STUDS PER PLAN MANUF. (I LAYER OF GURU BIRD BLOCK NAILING <br />LAMINATED GLA55 o PER STRUCTURAL NOTES <br />" <br />+12 -O A.F.F. / 2 BATT INSULATION <br />SHEETROCK PER PLAN LAYERS TEMPERED PER, PLAN BLOCK PER TRU55 SUPPLIER <br />BATT INSUL. PER PLAN <br />GLASS ®-12 ®® Q.F.F.) (4) Ind `i®F®NAILS <br />PER BLOCK <br />DRIP EDGE FLASHING <br />SHEAR ALL PER - <br />REO'D PER I.R.G. 2xG 0TTOM <br />DRYIN,�LL ��Gi�ER <br />- S5 CHORD <br />R� PLAN 4 SCHEDULE <br />i <br />CONT. METAL GUTTER <br />- CRICKET OVER i=ASGIA BOARD <br />2) 2x4 <br />PER PLAN <br />I <br />I' I <br />TRU55 BEYOND <br />_ _ 2x4 I NF I LL FRAMING 2'-0" O.H. <br />2x4 NAILERS <br />FINISH PER ELEVATION <br />OVER HOUSE NRAP SHEAR lNALL PER <br />OVER SHEATHING PER PLAN 4 SCHEDULE <br />PLAN TRU55 BEYOND <br />TYPICAL <br />I I T FLAT <br />I iN 6 �70 0�0 1, �I'E R�E ��A�R E�A 5� <br />14 SCALE: NOT TO SCALE I 5<°A1�E. I" = 1'-0" I SG�,LE: <br />SHIM AS NEEDED <br />INI NDON PER PLA <br />SCHEDULE <br />SCALE: NOT TO SCALE <br />ROOFING MATERIAL PER <br />ELEVATION OVER FELT <br />PAPER PER PLAN <br />4x ININDOYX HtADER <br />PER PLAN <br />FILL CAVITY c) <br />'-a HEADER W RIGID <br />"�� INSULATION <br />/�Ix TRIM <br />Ix TRIM, EXTENDED <br />_ <br />I "BEYOND lNALL <br />FINISH <br />51MP50N L550 @ :�4" 0.0. � <br />U55 PER PLAN <br />IP <br />tu <br />tu <br />I_ <br />REVIEWED FOR PERN11T <br />QgoU0 <br />T'- z z��LW <br />®wzO <br />t-62 W <br />W®oW�MW <br />��� 1 0Z� <br />® moo7, <br />- wr>-ViF=F—_ � <br />®<WGn <br />tL ��a�zWF-•�� <br />W �®UI�WJg <br />cnv�<F-orUsvi< <br />®Owza�� <br />wM=®F W <br />�x oa' <br />Wowu_0F=<M <br />a®�yWawwoofw <br />dZWh���u-a_Ib QQ <br />, <br />x <br />- <br />PROJECT MANAGER: <br />CHARLES PATTON <br />REVISED BY: DATE: <br />AG A 5/11/20 <br />AG ZA 10/2/20' <br />LATERAL BY: DATE: <br />LATERAL JOB NUMBER: <br />2x 5TUD5 PER PLAN <br />BATT IN5UL. PER PLAW, <br />WE 0 <br />PER PLAN <br />- <br />_ R r_ <br />6b <br />n <br />, <br />5UBFLOO <br />�- GLUED ;: NAILED <br />- FLOOR IST5. PER Q <br />0. A _ <br />(PARALLEL <br />t <br />BATT INSULATION PER PLAN <br />)'G PAPER BTW. �Ai <br />" <br />)P GANG <br />TOP FLANGE <br />4" CONG. 5LAE33 <br />\\/\\/ <br />®• <br />HANGERS PER PLAN <br />. <br />®® <br />P.T. MUD -SILL PER <br />STUB OUT #4 BAR <br />\� <br />I.R.C. R4043 <br />- <br />COUNTERSUNK ANCHOR <br />� <br />24" i �'° O.C, <br />\\ \ <br />41 <br />BOLTS PER FND. PLAN <br />4 BAR HORIZ, PER , / / <br />91 ; ® <br />OR STRUCTURAL NOTE5 <br />I.R.C. <br />li <br />4 BAR, HORIZ. PER <br />_ <br />� <br />I <br />I.R.O. R4O5.1.5,1 <br />4 ® <br />,- <br />-® <br />4 BAR x 1411 1@ <br />4'" dia. PERF. <br />�11 <br />(911 <br />511 <br />�J45" <br />®.C. W 4" HOOK <br />FND. DRAIN <br />iF D. <br />NALL vi/ <br />11®0I" <br />5CALF. 1" <br />(PRESCRIPTIVE) <br />FRAMING FND. DIM. <br />BATT INSUL. PER PLAN <br />SHEAR 1NALL PER <br />2x STUDS PER PLAN <br />PLAN $ SCHEDULE <br />5/4" T. 0. PL'(NOOD <br />FIN15H PER ELEVATION I <br />5UE3FLOOR, GLUED 4 NAILED <br />OVER HOUSE NRAP <br />FLOOR .15T5. PER PLAN <br />OVER SHEATHING PER <br />BATT INSULATION PER PLAN <br />PLANnr«- <br />16d @ 4" O.C. <br />C. <br />'Z' FLASHING <br />2x NOOD TRIM PER <br />PLAN (OPTIONAL). <br />!� <br />P.T. MUDm51LL PER <br />� <br />, � • � <br />I.R.C.I R404.5 <br />- <br />6d TOENAILS <br />11 II <br />II .11. <br />4 BAR HORIZ. PER <br />II <br />� <br />®O.C. <br />v� <br />I.R.C. R4O5,1,5.1 <br />X <br />� <br />a< TIG�#TLINE / \ <br />� <br />® <br />ANCHOR DOLTS PER <br />5T®RM , <br />I I® <br />FND. PL�iN ®R <br />� <br />DRAIN IF %�\� <br />�.� <br />5T CTU L NOTES <br />REOV <br />® <br />#4 BAR HORIZ. PER <br />! I <br />I.R.C. R4O5.1.5.1 <br />.Q <br />-6 MIL. BLACK V.B. <br />4" 0.Aia. PER. FND. DRAIN Yi <br />511 <br />roll <br />El <br />�II <br />Y®/ 4" HOOKCONT. <br />FILTER MEMBRANE <br />" GK" AROUND PIPE <br />BITUMINOUS DAMP -PROOFING <br />Fr ® <br />TOP OF FTC. TO FINISH G DE <br />SCALE: I " ® 1'-0" <br />PRESCRIPTIVE <br />V �I� I �!,✓ �x �lo� C`� Yd/ (mil ���, . <br />�� I � I Ia6�V�. <br />dia. HOLES PER 24" O.G. <br />PER PLAN <br />(BLK'G TO TOUCH TOP PLATE) <br />BIRD BLOCK NAILING <br />PER STRUCTURAL NOTES <br />DRIP EDGE FLASHING <br />REO'D PER I.R.G. <br />TRUSS PER <br />!x4 ELK. <br />,LAN <br />\HARVNARE <br />PER <br />GONT. METAL <br />STRUCTURAL NOTES <br />GUTTER OVER <br />FASCIA BOA <br />®VE�HANG PER PLAN <br />SIMPSON L55O ® 24" O.C. <br />PER PLAN <br />(BIRD f3LK'G TO TOP PLAT) <br />2x4 SOFFIT w/ OONTIN. <br />SHEAR LL PER PLAN <br />SCREENED VENT (IY2" SNIDE) <br />SCHEDULE OR HEADER <br />PER ELE\s O,_ �fissr—INSULATION <br />