Laserfiche WebLink
LO'f ' <br />a <br />B <br />GRANTER RELEASES ANY <br />INTEREST IN THE AREA <br />BETWEEN THE FENCE <br />AND PROPERTY LINE <br />UPON RECORDING <br />OF THIS PLAT (ALL LINES) <br />W <br />GRAPHIC SCALE <br />10 0 5 10 <br />i n= 0, <br />SEC 13, TWP 27 N, RGE 4 E, WM <br />r <br />r <br />4® a r r r r <br />~ <br />0_ r <br />~\79. 2, <br />\ <br />1 <br />STING ®® ,5 a <br />EX I AGE �� 3087 <br />GAR so FT <br />9 1 <br />J'OT� / v <br />RL <br />a EXISTING 01 V <br />Q ! USE 1 I <br />H o FT <br />4-g64 S0 <br />798,54 \� <br />SOIL AMENDMENT SPECIFICATIONS: <br />THE SOIL QUALITY DESIGN GUIDELINES CAN BE MET BY USING <br />ONE OF THE METHODS AS FOLLOWS. <br />1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND <br />PROTECT FROM COMPACTION DURING CONSTRUCTION. <br />2. AMEND DISTURBED SOIL ACCORDING TO THE FOLLOWING PROCEDURES: <br />a. SCARIFY SUBSOIL TO A DEPTH OF ONE FOOT. <br />b. IN PLANTING BEDS, PLACE THREE INCHES OF COMPOST AND TILL IN TO AN <br />EIGHT —INCH DEPTH. <br />c. IN TURF AREAS, PLACE TWO INCHES OF COMPOST AND TILL IN TO AN <br />EIGHT —INCH DEPTH. <br />e. APPLY TWO TO FOUR INCHES OF ARBORIST WOOD CHIP, COURSE BARK <br />MULCH, OR COMPOST MULCH TO PLANTING BEDS AFTER PLANTING. <br />ALTERNATIVELY, DISTURBED SOIL CAN BE AMENDED ON A SITE —CUSTOMIZED <br />MANNER SO THAT IT MEETS THE SOIL QUALITY CRITERIA AS APPROVED BY <br />CITY OF EVERETT. <br />3. STOCKPILE EXISTING TOPSOIL DURING GRADING, REPLACE IT PRIOR TO PLANTING. <br />STOCKPILED TOPSOIL MUST BE AMENDED IF NEEDED TO MEET THE ORGANIC <br />MATTER AND DEPTH REQUIREMENTS BY FOLLOWING THE PROCEDURES IN METHOD <br />(2) ABOVE. <br />4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE <br />ORGANIC MATTER AND DEPTH REQUIREMENTS. <br />MAINTENANCE: <br />A. SOIL QUALITY AND DEPTH SHOULD BE ESTABLISHED TOWARD THE END OF <br />CONSTRUCTION AND ONCE ESTABLISHED, SHOULD BE PROTECTED FROM <br />COMPACTION, SUCH AS FROM LARGE MACHINERY USE, AND FROM EROSION. <br />B. SOILS SHOULD BE PLANTED AND MULCHED AFTER INSTALLATION. <br />C. PLANT DEBRIS OR ITS EQUIVALENT SHOULD BE LEFT ON THE SIOIL SURFACE TO <br />REPLENISH ORGANIC MATTER. <br />"B"= SOIL MANAGEMENT PLAN AREA <br />PFN: <br />CALL DIAL -A -DIG <br />AT 811 <br />A MINIMUM OF 48 HOURS <br />BEFORE CONSTRUCTION BEGINS <br />2-5-2021 <br />0 <br />0 m 0 N <br />r \m .. <br />o N <br />o Ld o <br />V <br />o <br />1 <br />Z <br />N <br />Cn <br />Cn <br />CL <br />V <br />U <br />W <br />Us <br />Uj <br />rn <br />wt� <br />LO <br />r� <br />v <br />N LLo c <br />W�1 C4 o <br />F—Nin <br />N Ln o <br />A \ <br />N <br />Z <br />wOM <br />LU <br />Wow <br />z <br />w <br />N <br />N <br />N <br />W <br />V <br />Z <br />a <br />Z <br />W <br />0 <br />Z <br />w <br />WAN <br />�m0) <br />Z <br />Z <br />=M <br />> <br />w <br />UaO <br />U <br />Q <br />Q0 <br />W <br />W <br />J_ <br />0 <br />V) <br />11 <br />y <br />SHEET: REV: <br />OF: <br />4 <br />© Copyright 2019 by Brian R. Lindsay, BR.L Services ILC. Design, map, text and data may not be used, copied or reproduced in any way without express written permission of Brian R. Lindsay, BR£ Services LLC. <br />