My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-58 Plans 2022-11-09 (2)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-58 Plans 2022-11-09 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:02:22 AM
Creation date
7/20/2022 1:47:27 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1907-004
Year
2019
Notes
PARTIAL DEMO OF THE FOUNDATION TO SUPPORT PAINT BOOTH
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C3., � D5 i�5 DO C&5D5 C3.30 �&35 1 3.69 &7DO C3,75 Ch 1 4.8 5 <br />EART'IAL' SLAB PLAN <br />SCALE: <br />Ym <br />A <br />REVISION <br />777X CWC NEW BUILDING — RECORD WBS 2548317 <br />BY <br />KRW <br />APPROVED <br />DPB <br />DATE <br />01/03/17 <br />I SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />B <br />PFP SPAR PAINT BOOTH I AND 2 — XXX W5983281 <br />HG <br />RLT <br />xx.xx.xx <br />LEGEND <br />SLAB ON G11" �ADE, SEE MEET S268 <br />FOR SLAB ON GRADE SCHEDULE <br />Cj CONTROLICONSTRUCTION JOINT, <br />SEE SHEET S280 FOR DETAILS <br />GENERAL NOTES <br />CONSTRUCMN NOTES <br />REFERENCE DRAM,NGS <br />40-058—S268 SCHEDULES <br />-0 <br />li <br />Ec'r DAVN� m : oou�Tnom <br />RVP PROJMGRRL0 481 24' <br />I Fc--N,-r37iZL=ER: KBVV APPROVED: RLT SCALE: 1/8" mad <br />CHECKED: A M Vkl DATE: <br />ACCEPTABILITY DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL —'-- DATE <br />M EM 10/L9/14 � <br />CHECKED xx.xx.xx <br />WA THIS DESIGN AND/OR SLAB PLAN W59,!!�328, symBOL B <br />SPECIFICATION IS APPROVED AHM 10/09/14 -s-H -EfT <br />ENGINEER TITLE <br />APPROVED BY DEPT. DATE DPB 10/09/14 PFP SPAR PAINT BOOTH 1 AND 2 <br />)N If CHECKED <br />A2 1 0 L) <br />4 U <br />436 APPROVED B U I D N U 4v,-UOo -jO BN 6. COMP N57— <br />S T5?- W2548317 <br />SSrONv AL APPROVED DWG NO. <br />I STRUCTURAL MASTER COL. 3.50-4/A—B EVERETT, WA, 40-058—IS60 <br />J" <br />(;1O <br />& <br />& <br />B <br />3 0 % R 6 V1 1111, <br />R E- A 0 V"LlEXCM-d"AM"M - <br />06.05.19 <br />------------------ <br />is enginee red. <br />HRNIA d hl KI, I I'sti ii", ell <br />WWw.harnsgroup.corn <br />. . . . . . . . . . . . . . . . . . . . T FOR CONSTRUCTION i I EVI RSION "S" ONLY II <br />10 <br />11 <br />12 <br />'13 <br />1=4 <br />19 <br />20 <br />2'1 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />311 <br />32 <br />33 <br />34 <br />3 <br />36 <br />37 <br />38 <br />39 <br />40 <br />4'1 <br />- <br />4 <br />43 <br />ZI 4 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />511 <br />5E <br />56 <br />57 <br />58 <br />59 <br />'o <br />61 <br />62 �" I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.