Laserfiche WebLink
t <br /> Se <br /> Contents <br /> 1.0 Introduction 1 <br /> 2.0 Site Description 3 <br /> 2.1 Existing Conditions 3 <br /> 2.2 Proposed Construction Activities 3 <br /> 3.0 Construction Stormwater BMPs 5 <br /> 3.1 The 13 BMP Elements 5 <br /> 3.1.1 Element#1 —Mark Clearing Limits 5 <br /> 3.1.2 Element#2—Establish Construction Access 5 <br /> 3.1.3 Element#3 —Control Flow Rates 5 <br /> 3.1.4 Element#4—Install Sediment Controls 6 <br /> 3.1.5 Element#5—Stabilize Soils 6 <br /> 3.1.6 Element#6—Protect Slopes 6 <br /> 3.1.7 Element#7—Protect Drain Inlets 7 <br /> 3.1.8 Element#8—Stabilize Channels and Outlets 7 <br /> 3.1.9 Element#9—Control Pollutants 7 <br /> 3.1.10 Element#10—Control Dewatering 8 <br /> 3.1.11 Element#11 —Maintain BMPs 8 <br /> 3.1.12 Element#12—Manage the Project 8 <br /> 3.1.12 Element#13—Manage the Project 10 <br /> 3.2 Site Specific BMPs 10 <br /> 4.0 Construction Phasing and BMP Implementation 11 <br /> 5.0 Pollution Prevention Team 12 <br /> 5.1 Roles and Responsibilities 12 <br /> 5.2 Team Members 13 <br /> 6.0 Site Inspections and Monitoring 14 <br /> 6.1 Site Inspection 14 <br /> 6.1.1 Site Inspection Frequency 15 <br /> 6.1.2 Site Inspection Documentation 15 <br /> 6.2 Stormwater Quality Monitoring 15 <br /> 7.0 Reporting and Recordkeeping 16 <br /> 7.1 Recordkeeping 16 <br /> 7.1.1 Site Log Book 16 <br /> 7.1.2 Records Retention 16 <br /> 7.1.3 Access to Plans and Records 16 <br /> 7.1.4 Updating the SWPPP 16 <br /> 7.2 Reporting 16 <br /> P:\R\RMCA00000009\0600INFO\0670Reports\SWPPP\2017-3-10_SWPPP Report.docx <br /> Grandview Apartments Clubhouse <br /> SWPPP i March,2017 <br />