My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
859 LOCUST ST 2022-07-20
>
Address Records
>
LOCUST ST
>
859
>
859 LOCUST ST 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:32:51 PM
Creation date
7/20/2022 2:29:31 PM
Metadata
Fields
Template:
Address Document
Street Name
LOCUST ST
Street Number
859
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> • Emphasize erosion control rather than sediment control. <br /> • Minimize the extent and duration of the area exposed. <br /> • Keep runoff velocities low. <br /> • Retain sediment on site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> In addition,project management will incorporate the key components listed below: <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure <br /> continued performance of their intended function. Site inspections shall be <br /> conducted by a person who is knowledgeable in the principles and practices <br /> of erosion and sediment control at least once every calendar week and within <br /> 24 hours of any major rainfall event. This person has the necessary skills to: <br /> • Assess the site conditions and construction activities that could impact <br /> the quality of stormwater, and <br /> • Assess the effectiveness of erosion and sediment control measures used <br /> to control the quality of stormwater discharges. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified in <br /> this SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained near the construction activities or within <br /> reasonable access. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation,or maintenance at the construction site that has, or <br /> could have, a significant effect on the discharge of pollutants to waters of the <br /> state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state regulatory <br /> Grandview Apartments Clubhouse <br /> SWPPP 9 March,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.