My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
859 LOCUST ST 2022-07-20
>
Address Records
>
LOCUST ST
>
859
>
859 LOCUST ST 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:32:51 PM
Creation date
7/20/2022 2:29:31 PM
Metadata
Fields
Template:
Address Document
Street Name
LOCUST ST
Street Number
859
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 6.0 Site Inspections and Monitoring <br /> Monitoring includes visual inspection,monitoring for water quality parameters of concern, and <br /> documentation of the inspection and monitoring findings in a site log book. A site log book will <br /> be maintained for all construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit <br /> requirements; <br /> • Site inspections; and, <br /> • Stormwater quality monitoring. <br /> For convenience,the inspection form and water quality monitoring forms included in this <br /> SWPPP include the required information for the site log book. This SWPPP may function as the <br /> site log book if desired, or the forms may be separated and included in a separate site log book. <br /> However, if separated,the site log book must be maintained on-site or within reasonable access <br /> to the site and be made available upon request to Ecology or the local jurisdiction. <br /> 6.1 Site Inspection <br /> All BMPs shall be inspected,maintained, and repaired as needed to assure continued <br /> performance of their intended function. Site inspections shall be conducted by a person who is <br /> knowledgeable in the principles and practices of erosion and sediment control at least once every <br /> calendar week and within 24 hours of any major rainfall event. This person has the necessary <br /> skills to: <br /> • Assess the site conditions and construction activities that could impact the quality of <br /> stormwater, and <br /> • Assess the effectiveness of erosion and sediment control measures used to control the <br /> quality of stormwater discharges. <br /> All BMPs will be inspected,maintained, and repaired as needed to assure continued performance <br /> of their intended function. A Certified Erosion and Sediment Control Lead(CESCL) shall not be <br /> required for this project as less than an acre will be disturbed during the construction of this <br /> project. <br /> Site inspection will occur in all areas disturbed by construction activities and at all stormwater <br /> discharge points. Stormwater will be examined for the presence of suspended sediment, <br /> turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the <br /> effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the <br /> BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be <br /> Grandview Apartments Clubhouse <br /> SWPPP 14 March,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.