Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 7.0 Reporting and Recordkeeping <br /> 7.1 Recordkeeping <br /> 7.1.1 Site Log Book <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit <br /> requirements; and, <br /> • Site inspections; and, <br /> For convenience,the inspection form is included in this SWPPP include the required information <br /> for the site log book. <br /> 7.1.2 Records Retention <br /> Records of all monitoring information(site log book, inspection reports/checklists,etc.),this <br /> Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit <br /> requirements will be retained during the life of the construction project. <br /> 7.1.3 Access to Plans and Records <br /> The SWPPP and Site Log Book will be retained on site or within reasonable access to the site <br /> and will be made immediately available upon request to the local jurisdiction. <br /> 7.1.4 Updating the SWPPP <br /> This SWPPP will be modified if the SWPPP is ineffective in eliminating or significantly <br /> minimizing pollutants in stormwater discharges from the site or there has been a change in <br /> design, construction, operation,or maintenance at the site that has a significant effect on the <br /> discharge, or potential for discharge, of pollutants to the waters of the State. The SWPPP will be <br /> modified within seven days of determination based on inspection(s)that additional or modified <br /> BMPs are necessary to correct problems identified, and an updated timeline for BMP <br /> implementation will be prepared. <br /> 7.2 Reporting <br /> The construction site is less than one acre in size and does not discharge to an impaired water <br /> body, and is therefore not subject to the reporting requirements set forth in the Construction <br /> Stormwater General Permit. <br /> Grandview Apartments Clubhouse <br /> SWPPP 16 March,2017 <br />