Laserfiche WebLink
• <br /> Construction Stormwater <br /> SITE INSPECTION CHECKLIST <br /> Project: Grandview Apartments Clubhouse <br /> Inspector: <br /> Date: Time: <br /> Site BMPs Condition Repair? Comments/Observations <br /> GF PY N <br /> Clearing Limits <br /> • C103-Plastic or Metal Fencing - - <br /> Construction access/Roads <br /> • C105: Stabilized Construction Entrance rrr — <br /> Install Sediment Controls <br /> • C233— Silt Fence - rr r r <br /> • C220-Strom Drain Inlet Protection r r r r <br /> • Other: <br /> Stabilize Slopes and Soils <br /> • C120— Temporary and Permanent Seeding r- <br /> • C121— Temporary and Permanent Seeding ,-- r rr <br /> • C140-Dust Control rrrrr <br /> • C123-Plastic covering rrrr- r <br /> • C150-Materials on hand rrrrr <br /> • Other: rrrrr <br /> Protect Slopes <br /> • Other: r r - r <br /> G=Good F=Fair P=Poor Y=Yes N=No N/A=Not Applicable <br /> Will existing BMPs need to be modified or removed, or other BMPs <br /> — YES — NO <br /> installed? <br /> IF YES, list the action items to be completed on the following table: <br /> Date Completed/ <br /> Actions to be Completed Initials <br /> 1. <br /> 2. <br /> 3. <br /> 4. <br /> Adapted from How to do Stormwater Monitoring, Publication#06-10-020 <br />