Laserfiche WebLink
4 le F <br /> Construction Stormwater <br /> SITE INSPECTION CHECKLIST <br /> Project: Grandview Apartments Clubhouse <br /> Inspector: <br /> Date: Time: <br /> Describe current weather conditions: <br /> Approximate amount of precipitation since last inspection: inches <br /> and precipitation in the past 24 hours*: inches <br /> *based on an on-site rain gauge or local weather data. <br /> Describe discharging stormwater, if present (note the presence of suspended sediment, <br /> "cloudiness", discoloration, or oil sheen): <br /> Was water quality sampling part of this inspection? YES NO <br /> If yes, record results below (attach separate sheet, if necessary): <br /> Parameter: Method (circle one) Result Units <br /> Turbidity tube, meter, laboratory NTU (cm, if tube used) <br /> pH paper, kit, meter pH standard units <br /> Phosphorus <br /> Is the site in compliance with the SWPPP and the permit YES NO <br /> requirements? <br /> If no, indicate tasks necessary to bring site into compliance on the <br /> "Actions to be Completed" table above, and include dates each job YES NO <br /> WILL BE COMPLETED. <br /> If no, has the non-compliance been reported to Dept. of Ecology? YES NO <br /> If no, should the SWPPP be modified: YES NO <br /> Sign the following certification: <br /> "I certify that this report is true, accurate, and complete, to the best of my knowledge <br /> and belief." <br /> Inspection completed on: by: <br /> Title/Qualification of Inspector: <br /> Adapted from How to do Stormwater Monitoring, Publication# 06-10-020 <br />