My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
859 LOCUST ST 2022-07-20
>
Address Records
>
LOCUST ST
>
859
>
859 LOCUST ST 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:32:51 PM
Creation date
7/20/2022 2:29:31 PM
Metadata
Fields
Template:
Address Document
Street Name
LOCUST ST
Street Number
859
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' T <br /> 0 <br /> discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained near the construction activities or within <br /> reasonable access. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation,or maintenance at the construction site that has,or <br /> could have, a significant effect on the discharge of pollutants to waters of the <br /> state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator,or the applicable local or state regulatory <br /> authority, it is determined that the SWPPP is ineffective in eliminating or <br /> significantly minimizing pollutants in stormwater discharges from the site. <br /> The SWPPP shall be modified as necessary to include additional or modified <br /> BMPs designed to correct problems identified. Revisions to the SWPPP <br /> shall be completed within seven(7)days following the inspection. <br /> Element#13—Protect Low Impact Development BMP's <br /> The low impact development BMPs proposed for this project are required to be protected. Rain <br /> gardens shall be protected from sedimentation through installation and maintenance of erosion <br /> and sediment controls on upstream conveyance components. Rain gardens must be protected <br /> from compaction due to construction equipment and foot traffic. The following relevant BMPs <br /> for this project include: <br /> BMP C103: High Visibility Fence <br /> BMP C201: Grass-Lined Channels <br /> DAVID EVANS AND ASSOCIATES,INC. <br /> GRANDVIEW APARTMENTS CLUBHOUSE MARCH,2017 <br /> STORMWATER SITE PLAN PAGE 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.