My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2901 LOWELL-SNOHOMISH RIVER RD 2022-07-20
>
Address Records
>
LOWELL-SNOHOMISH RIVER RD
>
2901
>
2901 LOWELL-SNOHOMISH RIVER RD 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:56:30 PM
Creation date
7/20/2022 2:54:26 PM
Metadata
Fields
Template:
Address Document
Street Name
LOWELL-SNOHOMISH RIVER RD
Street Number
2901
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR #2 Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updated during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> 74* Nature and purpose of the construction project: <br /> The City of Everett Parks and Community Services is proposing to construct a <br /> 0.85-acre off leash dog park located adjacent to the Lowell Riverfront Trail. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> Snohomish River <br /> How upstream drainage areas may affect the site: <br /> N/A-The site is located in between the railroad and the Snohomish River. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Site runoff flows overland across a gentle slope and discharges directly to the <br /> Snohomish River. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> None <br /> Special requirements and provisions for working near or within critical areas: <br /> N/A <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.