Laserfiche WebLink
Task 4: List#3 approach to MR #5 compliance (flow control exempt projects only) <br /> You are required to use the first applicable BMP that is considered feasible in each <br /> category(lawn, landscape and hard surfaces) below. <br /> Mark whether the BMP is feasible or infeasible. If you select infeasible,cite the reasons for <br /> infeasibility(See Worksheet 2) and or a reference to supporting documentations (such as a <br /> geotechnical report). <br /> List#3: On-Site Stormwater Management BMPs for Flow Control Exempt Projects <br /> a ago{ 1 ,-,:,,'1 1 nlor-4.c .d°Ato 211 ,=¢': 7, <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T5.13: Post-Construction Soil <br /> Quality and Depth I✓ <br /> c ,r_ r I 0, �; Not applicable. <br /> Feasible Infeasible If infeasible provide justification <br /> *BMP T5.10A: Downspout Full Infiltration 1— -1 *Soils report required for this BMP <br /> or <br /> BMP 5.30: Full Dispersion I-- <br /> BMP T5.10B: Downspout Dispersion - <br /> Systems <br /> BMP T5.10C: Perforated Stub-out <br /> Connections l 1 <br /> ;i:- <br /> Feasible Infeasible If infeasible provide justification <br /> BMP T5.12: Sheet Flow Dispersion 7 <br /> or <br /> BMP T5.11: Concentrated Flow r <br /> Dispersion <br /> 0 Task 5: Attach sizing implementation for the BMP selected above in List #1 or #3. <br /> Worksheet 3 (attached) provides tools for sizing your selected BMP. Fill out the sizing <br /> justification sheet for your selected BMP in Worksheet 3 and submit to Permit Services <br /> attached to this report. <br /> The project meets the vegetated flow path requirements for BMP T5.12. <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 19 <br />