Laserfiche WebLink
• • e . <br /> Task 1: Describe the project during construction <br /> Nature and purpose of the construction project: <br /> Residential addition <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that <br /> might be affected by the construction project: <br /> East fork Pigeon Creek No. 2 <br /> How upstream drainage areas may affect the site: <br /> No effect. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> East fork Pigeon Creek No. 2 leading to wetland approx. 400 ft. to the south. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> None. <br /> Special requirements and provisions for working near or within critical areas: <br /> N/A <br /> Areas on the site that have potential erosion problems: <br /> None. <br /> Locations where surface water leaves the site: <br /> Natural drainage to East fork Pigeon Creek No. 2 at the west property line. <br /> City of Everett Public Works % ' <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP) Template for Small Projects <br />