My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3610 W MUKILTEO BLVD Geotech Report 2022-10-25
>
Address Records
>
W MUKILTEO BLVD
>
3610
>
Geotech Report
>
3610 W MUKILTEO BLVD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:07:08 PM
Creation date
7/20/2022 3:45:25 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3610
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No. 1129119 <br /> Zahler Residence Development October 14,2019 <br /> Everett,Washington Page 9 <br /> Retaining Walls <br /> Specific grading plans for this project were not available at the time this report was prepared, but <br /> retaining walls may be incorporated into project plans. In general, the lateral pressure acting on <br /> subsurface retaining walls is dependent on the nature and density of the soil behind the wall, the amount <br /> of lateral wall movement which can occur as backfill is placed, wall drainage conditions, and the <br /> inclination of the backfill. For walls that are free to yield at the top at least one thousandth of the height <br /> of the wall (active condition), soil pressures will be less than if movement is limited by such factors as <br /> wall stiffness or bracing (at-rest condition). We recommend that walls supporting horizontal backfill and <br /> not subjected to hydrostatic forces,be designed using a triangular earth pressure distribution equivalent to <br /> that exerted by a fluid with a density of 35 pcf for yielding (active condition) walls, and 55 pcf for non- <br /> yielding (at-rest condition) walls. A seismic design loading of 8H should also be included in the wall <br /> design. It represents the total height of the wall. <br /> These recommended lateral earth pressures are for a drained granular backfill and are based on the <br /> assumption of a horizontal ground surface behind the wall for a distance of at least the height of the wall, <br /> and do not account for surcharge loads. Additional lateral earth pressures should be considered for <br /> surcharge loads acting adjacent to the walls and within a distance equal to the height of the wall. This <br /> would include the effects of surcharges such as traffic loads, floor slab loads, slopes, or other surface <br /> loads. We could consult with the structural engineer regarding additional loads on retaining walls during <br /> final design,if needed. <br /> The lateral pressures on walls may be resisted by friction between the foundation and subgrade soil,and <br /> by passive resistance acting on the below-grade portion of the foundation. Recommendations for <br /> frictional and passive resistance to lateral loads are presented in the Foundations subsection of this <br /> report. <br /> All wall backfill should,be well compacted as outlined in the Structural Fill subsection of this report. <br /> Care should be taken to prevent the buildup of excess lateral soil pressures due to over-compaction of the <br /> wall backfill. This can be accomplished by placing wall backfill in 8-inch loose lifts and compacting the <br /> backfill with small, hand-operated compactors within a distance behind the wall equal to at least half the <br /> height of the wall. The thickness of the loose lifts should be reduced to accommodate the lower <br /> compactive energy of the hand-operated equipment. The recommended level of compaction should still <br /> be maintained. <br /> • <br /> Permanent drainage systems should be installed for retaining walls. Recommendations for these systems <br /> are found in the Subsurface Drainage subsection of this report. We recommend that we be retained to <br /> evaluate the proposed wall drain backfill material and observe installation of the drainage systems. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.