My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3610 W MUKILTEO BLVD Geotech Report 2022-10-25
>
Address Records
>
W MUKILTEO BLVD
>
3610
>
Geotech Report
>
3610 W MUKILTEO BLVD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:07:08 PM
Creation date
7/20/2022 3:45:25 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3610
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No. 1129119 <br /> Zahler Residence Development October 14,2019 <br /> Everett,Washington Page 11 <br /> Pavements <br /> Pavement subgrade preparation and structural filling where required, should be completed as <br /> recommended in the Site Preparation and Grading and Structural Fill subsections of this report. The <br /> pavement subgrade should be proof-rolled with a heavy, rubber-tired piece of equipment, to identify soft <br /> or yielding areas that require repair. The pavement section should be underlain by a stable subgrade. We <br /> should be retained to observe the proof-rolling and recommend repairs prior to placement of the asphalt or <br /> hard surfaces. <br /> Utilities <br /> We recommend that underground utilities be bedded with a minimum 12 inches of pea gravel prior to <br /> backfilling the trench with on-site or imported material. Trenches within settlement sensitive areas should <br /> be compacted to 95% of the modified proctor as described in the Structural Fill subsection of this report. <br /> Trenches located in non-structural areas should be compacted to a minimum 90% of the maximum dry <br /> density. The trench backfill compaction should be tested. <br /> Site Drainage <br /> Infiltration: The 2014 DOE SWMMWW was utilized to determine the long-term design infiltration rate <br /> of the site soils. According to this manual,on-site infiltration testing consisting of the Small-Scale Pilot <br /> Infiltration Test(PIT)was used to determine the long-term design infiltration rates. We conducted one <br /> small scale PIT as shown on the attached Schematic Site Plan in Figure 2. The subsurface soil generally <br /> consisted of gray silty fine to medium sand with gravel,which we interpreted as native glacial till soils. <br /> The test was conducted within a pit that measured 4.0-feet long by 3.0-feet wide by 4.0-feet deep. As <br /> soon as the Infiltration Pit 1 was excavated, the pit was filled with 12 inches of water and we began the <br /> soaking period of the PIT for approximately 6-hours. At this time, the water flow rate into the hole was <br /> monitored with a Great Plains Industries(GPI)TM 075 water flow meter for the pre-soak period. <br /> After the 6-hour soaking period was completed, the water level was maintained at a depth of <br /> approximately 12 inches, respectively, for one hour for the steady-state period. The flow rate for <br /> Infiltration Pit 1 stabilized at 0.035 gallons per minute (2.1 gallons per hour). This equated to an <br /> approximate infiltration rate of 0.28 inches per hour. The water was shut off after the steady-state period <br /> and monitored at least every 15 minutes for one hour. After one hour, the water level within the pit had <br /> decreased by 0.25 inches,resulting in a falling-head infiltration rate of 0.25 inches per hour. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.