Laserfiche WebLink
viciNin MAP <br />SCALE: NTS <br />SYm REVISION BY APPROVED DATE SYM REVISION <br />CRG 45-001 WSCEA_LANEOCS SYSTEMS 1786915 CEI/EO j EO 1115,19 <br />It' W, Ii, mm <br />LOCATION MAP <br />Ask <br />Boeing <br />All <br />PROJECT SITE <br />er <br />SITE PLAN <br />SCALE: NTS <br />g� S ° O g ACCEPTABILITY <br />THIS DESIGN APED/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY DEPT. I DATE <br />0 <br />a <br />r <br />Perimit#: <br />D1912-027 <br />Site ,Address: <br />3003 W CASINO RD 5-01 <br />�'- <br />Owner: <br />BOEING COMPANY <br />'I <br />Tenant: <br />DOEQNG COMPANY <br />114,Ai a <br />App. Date: <br />12/20/2019 <br />Prcpcsed Use: <br />COMMERCIAL <br />Description: <br />STIR COMPONENTS FOR NEW AIR SYSTEM <br />FOR PAINT HANGER- -5-Dl <br />GRO <br />p <br />",Reviewedt <br />�i ✓ '�✓ -A` <br />D a t - � 1 <br />�> e. <br />Office Set <br />.lob SILe�Set Fir(-/Plnning SPt <br />t � <br />,P,'ROJECT DESCRIPTION <br />TIE SCOPE OF THIS PROJECT INCLUDES UPGRADES OF MULTIPLE SYSTEMS IN THE 45-01 <br />HANGAR. ITEMS INCLUDE: PROCESS '-AIR SYSTEM, PROCESS AND WASTE DATER SYSTEM, SOLVENT <br />RECOVERY SYSTEM, MISCELLANEOUS BUILDING CONTROL SYSTEMS, TRASH COMPACTOR CONTROLS, <br />OVER WING SAFETY HOIST SYSTEM,; NETWORKING, LEMS AND LEMS CATWALK REMOVAL, <br />STRUCTURAL VERTICAL UPGRADES, <br />q.� <br />D E S I G N T <br />x� <br />EAA <br />OM1 r <br />COFF AN ENGINEERS � i <br />PRIME CONSULTANT: STRU,CT,)RAL/MECHANICAL/ELECTRICAL <br />.w <br />1101 SECOND AVENUE, QUITE <br />SEATTLE, WA. 96101�°' <br />(206) 623-0717' <br />CONCEPT SYSTEMS INC <br />SUBCONSULTANT: CONTROLS 'INTEGRATION <br />12101 TUKWILA INTERNATIONAL' B'LVD, SUITE 210 <br />SEATTLE, WA. 96166 <br />(206) 791-5140 <br />�1 <br />DATE SUBTFLE <br />04.19.17 COVER HEFT <br />04.19.17 <br />FOTLE 45-001 MISCELLANEOUS SYSTEMS <br />04.19.1 7 ` <br />�. "Y <br />-" i <br />_ ARCHITECTURAL MASTER <br />a:. <br />m <br />JOB NO. <br />EVERETT, WA DWG N®. <br />-n-I m <br />t 11 l W 'I f <br />c <br />n <br />