EXISTING CONSTRUCTION
<br />1. EXISTING STRUCTURAL DIMENSIONS AND MEMBERS SIZES ARE FOR REFERENCE ONLY.
<br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO FABRICATION.
<br />THE CONTRACTOR SHALL VERIFY THE ACTUAL CONFIGURATION OF EXISTING
<br />CONSTRUCTION AND THE CONDITION OF THE STRUCTURE BEFORE BEGINNING WORK,
<br />ANY DISCREPANCIES OR UNSOUND CONDITIONS SHALL BE REPORTED TO THE
<br />STRUCTURAL ENGINEER FOR RESOLUTION BEFORE BEGINNING WORK. REFER TO
<br />ARCHITECTURAL, PLANS FOR DIMENSIONS, EMBEDMENTS AND OPENINGS NOT SHOWN.
<br />REFER TO MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR DUCTS, PIPING,
<br />EMBEDMENTS, AND OPENINGS NOT SHOWN.
<br />2. TEMPORARY SHORING AND BRACING MAY BE NECESSARY IN ORDER TO PERFORM THE
<br />NECESSARY STRUCTURAL MODIFICATIONS TO THE EXISTING STRUCTURE SHOWN ON
<br />THE STRUCTURAL AND ARCHITECTURAL DRAWINGS. THE CONTRACTOR MUST SUBMIT
<br />PLANS AND SUPPORTING CALCULATIONS PREPARED BY A DESIGN PROFESSIONAL
<br />LICENSED TO PERFORM WORK IN THE PROJECT JURISDICTION.
<br />3. WHERE NEW STRUCTURAL WORK IS BEING PERFORMED, THE CONTRACTOR SHALL
<br />VERIFY ALL DIMENSIONS AS REQUIRED PRIOR TO CONSTRUCTION. ANY
<br />DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT FOR RESOLUTION PRIOR TO
<br />BEGINNING WORK.
<br />4. EXISTING CONSTRUCTION, FRAMING MEMBERS AND DIMENSIONS HAVE BEEN
<br />ESTABLISHED BASED ON REVIEW OF THE AVAILABLE CONSTRUCTION DRAWINGS FOR
<br />THE ORIGINAL BUILDING. ONLY LIMITED FIELD VERIFICATION HAS BEEN PERFORMED.
<br />ANY DISCREPANCIES CONCERNING HOW NEW WORK RELATED TO THE AS -BUILT
<br />CONSTRUCTION SHALL BE REPORTED TO THE STRUCTURAL ENGINEER FOR RESOLUTION
<br />PRIOR TO BEGINNING WORK.
<br />5. UNLESS SPECIFIED OTHERWISE, LOCATION AND ELEVATION OF NEW STRUCTURAL
<br />ELEMENTS WITHIN THE EXISTING STRUCTURE ARE DETERMINED BY THEIR RELATIONSHIP
<br />TO EXISTING CONDITIONS, THESE RELATIONSHIPS ARE NOTED ON THE PLANS,
<br />SECTIONS AND DETAILS.
<br />6, WHEN PROVIDED, DEMOLITION DRAWINGS INDICATE DEMOLITION EXTENT ASSOCIATED
<br />WITH THE ACTUAL SIZE OF THE NEW ELEMENT. THE EXTENT OF DEMO MAY NOT
<br />REFLECT ADDITIONAL DEMOLITION REQUIRED TO INSTALL NEW ELEMENTS. IN ADDITION
<br />TO WHAT IS SHOWN ON THE ARCHITECTURAL DEMOLITION DRAWINGS, MINOR LOCAL
<br />DEMOLITION OF EXISTING ELEMENTS MAY BE REQUIRED TO PERFORM THE
<br />STRUCTURAL WORK AS INDICATED ON THE PLANTS, SECTIONS AND DETAILS.
<br />DEMOLITION
<br />1. ALL DEMOLITION SHALL BE CARRIED ON IN SUCH A MANNER AS NOT TO DAMAGE
<br />EXISTING ELEMENTS WHICH ARE TO REMAIN A PART OF THE FINISHED STRUCTURE.
<br />2. EXISTING ELEMENTS SHALL BE PROTECTED TO THE FULLEST EXTENT POSSIBLE TO
<br />REDUCE SUCH DAMAGE TO A MINIMUM.
<br />3. ALL ELEMENTS OF THE STRUCTURE THAT ARE TO REMAIN AND WHICH ARE DAMAGED
<br />DURING DEMOLITION WORK SHALL BE REPLACED AT NO ADDED COST.
<br />SPECIAL INSPECTION
<br />1. SPECIAL INSPECTION BY A REGISTERED DEPUTY BUILDING INSPECTOR, IN CONTRACT
<br />WITH THE OWNER AND APPROVED BY THE BUILDING OFFICIAL, SHALL BE REQUIRED
<br />FOR THE FOLLOWING TYPES OF WORK (SEE THE PROJECT SPECIFICATIONS FOR
<br />FURTHER REQUIREMENTS):
<br />ITEM BUILDING CODE
<br />REFERENCE
<br />STEEL 1705.2 AND
<br />AISC 360 CHAPTER N
<br />DETAIL VERIFICATION
<br />WELDING OF STRUCTURAL STEEL
<br />HIGH STRENGTH BOLTING
<br />2. SPECIAL INSPECTIONS SHALL NOT BE REQUIRED WHEN THE WORK IS DONE ON THE
<br />PREMISES OF A FABRICATOR REGISTERED AND APPROVED BY THE BUILDING OFFICIAL
<br />TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. CERTIFICATES OF
<br />COMPLIANCE SHALL BE SUBMITTED TO THE BUILDING OFFICIAL FROM THE
<br />FABRICATORS OR MANUFACTURERS OF THE FOLLOWING COMPONENTS:
<br />STRUCTURAL STEEL
<br />3. EPDXY OR EXPANSION TYPE ANCHORS SHALL BE APPROVED BY THE BUILDING
<br />OFFICIAL FOR THEIR USE AND SHALL BE INSTALLED ACCORDING TO THE
<br />MANUFACTURER'S RECOMMENDATIONS AND ICC PRODUCT APPROVAL CONDITIONS.
<br />4. NONDESTRUCTIVE INSPECTION OF ALL WELDS, SHOP AND FIELD, OF
<br />MOMENT -RESISTING FRAMES SHALL BE PROVIDED IN ACCORDANCE WITH THE
<br />GOVERNING CODE.
<br />5. SUMMARY REPORTS OF ALL INSPECTIONS AND TEST RESULTS SHALL BE DISTRIBUTED
<br />TO THE OWNER, STRUCTURAL ENGINEER, AND BUILDING OFFICIAL WITH DEFICIENCIES
<br />CLEARLY NOTED.
<br />6. DEFICIENCIES SHALL BE REPORTED TO THE CONTRACTOR ON A DAILY BASIS.
<br />7. DEFINITIONS OF SPECIAL INSPECTIONS AND TESTING FREQUENCY:
<br />A. (PER) PERIODIC OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN
<br />APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE
<br />WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION OF THE
<br />WORK.
<br />B. (CONT) CONTINUOUS OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION
<br />BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE
<br />THE WORK IS BEING PERFORMED.
<br />SPECIAL INSPECTION CONT.
<br />8. STEEL INSPECTIONS
<br />A. WELDS, PRIOR TO WELDING
<br />i. (CONT) WELDING PROCEDURE SPECIFICATIONS (WPSS) AVAILABLE.
<br />ii. (CONT) MANUFACTURE CERTIFICATIONS FOR WELDING CONSUMABLES
<br />AVAILABLE.
<br />iii. (PER) MATERIAL IDENTIFICATION (TYPE/GRADE).
<br />iv. (PER) WELDER IDENTIFICATION SYSTEM - THE FABRICATOR OR ERECTOR,
<br />AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO
<br />HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED.
<br />V. (PER) FIT -UP OR GROVE WELDS (INCLUDING JOINT GEOMETRY).
<br />vi. (PER) CONFIGURATION AND FINISH OF ACCESS HOLES.
<br />vii. (PER) FIT -UP OF FILLET WELDS.
<br />viii. (PER) CHECK WELDING EQUIPMENT.
<br />B. WELDS, DURING WELDING
<br />i. (PER) USE OF QUALIFIED WELDERS.
<br />ii. (PER) CONTROL AND HANDLING OF WELDING CONSUMABLES.
<br />iii. (PER) NO WELDING OVER CRACKED WELDS.
<br />iv. (PER) ENVIRONMENTAL CONDITIONS.
<br />V. (PER) WPS FOLLOWED.
<br />vi. (PER) WELDING TECHNIQUES.
<br />C. WELDS, AFTER WELDING
<br />i. (PER) WELDS CLEANED.
<br />ii. (CONT) SIZE, LENGTH AND LOCATION OF WELDS.
<br />iii. (CONT) WELDS MEET VISUAL ACCEPTANCE CRITERIA.
<br />iv. (CONT) ARC STRIKES.
<br />V. (CONT) K-AREA (WHEN WELDING OF DOUBLER PLATES, CONTINUITY
<br />PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE K-AREA,
<br />VISUALLY INSPECT THE WEB K-AREA FOR CRACKS WITHIN 31N OF THE
<br />WELD.
<br />vi. (CONT) BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED).
<br />vii. (CONT) REPAIR ACTIVITIES.
<br />viii. (CONT) DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR
<br />MEMBER.
<br />D. NONDESTRUCTIVE WELD TESTING
<br />i. CJP WELDS - ULTRASONIC TESTING SHALL BE PERFORMED ON ALL CJP
<br />JOINTS IN MATERIALS 5/16 INCH AND THICKER.
<br />ii. WELD ACCESS HOLES IN MATERIALS 1 1 /2 INCH OR THICKER -
<br />FLANGES SHALL BE TESTED USING MAGNETIC PARTICLE OR PENETRANT
<br />TESTING.
<br />iii. AFTER JOINT COMPLETION, BASE METAL THICKER THAN 1 % INCH WHERE
<br />THE CONNECTED MATERIAL IS GREATER THAN 3/4 INCH, AND CONTAINS
<br />CJP GROOVE WELDS, SHALL BE ULTRASONICALLY TESTED.
<br />iv. REDUCED BEAM SECTION REPAIR - MP TESTING SHALL BE PERFORMED
<br />ON ANY WELD AND ADJACENT AREA OF THE REDUCED BEAM SECTION
<br />CUT SURFACE THAT HAS BEEN REPAIRED BY WELDING, OR ON THE BASE
<br />METAL OF THE REDUCED BEAM SECTION CUT SURFACE IF A SHARP
<br />NOTCH HAS BEEN REMOVED BY GRINDING.
<br />V. WELD TAB REMOVAL SITES - AT THE END OF WELDS, WHERE WELD
<br />TABS HAVE BEEN REMOVED, MPT SHALL BE PERFORMED ON THE SAME
<br />BEAM -TO -COLUMN JOINTS RECEIVING UT.
<br />E. BOLTS, PRIOR TO BOLTING
<br />i. (CONT) MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER
<br />MATERIALS.
<br />ii. (PER) FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS.
<br />iii. (PER) PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE,
<br />TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM SHEAR
<br />PLANE).
<br />iv. (PER) PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL.
<br />V. (PER) CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING
<br />SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET
<br />APPLICABLE REQUIREMENTS.
<br />vi. (PER) PRE -INSTALLATION VERIFICATION TESTING BY INSTALLATION
<br />PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES
<br />AND METHODS USED.
<br />vii. (PER) PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND ER
<br />FASTENER COMPONENTS.
<br />F. BOLTS, DURING BOLTING
<br />i. (PER) FASTENERS ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL
<br />HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED.
<br />ii. (PER) JOINT BROUGHT TO THE SNUG -TIGHT CONDITION PRIOR TO THE
<br />PRETENSIONING OPERATION.
<br />iii. (PER) FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED
<br />FROM ROTATING.
<br />iv. (PER) FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC
<br />SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID
<br />POINT TOWARD THE FREE EDGES.
<br />G. BOLTS, AFTER BOLTING
<br />i. (CONT) DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED
<br />CONNECTIONS.
<br />SPECIAL INSPECTION CONT.
<br />H. OTHER STEEL INSPECTIONS
<br />i. (PER) VERIFICATION OF STRUCTURAL STEEL DETAILING - VERIFY
<br />COMPLIANCE WITH THE DETAILS SPECIFIED ON THE STRUCTURAL
<br />DRAWINGS.
<br />ii. (CONT) ANCHOR RODS/EMBEDS - VERIFY MATERIAL, GRADE, DIAMETER,
<br />LENGTH AND TYPE OF ELEMENT AND EMBEDMENT DEPTH.
<br />iii. (CONT) PROTECTED ZONE - NO HOLES AND UNAPPROVED ATTACHMENTS
<br />MADE.
<br />iv. (CONT) RBS GEOMETRY REQUIREMENTS, IF APPLICABLE.
<br />STRUCTURAL OBSERVATION
<br />1. STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM IN
<br />ACCORDANCE WITH THE GOVERNING CODE. STRUCTURAL OBSERVATION IS THE VISUAL
<br />OBSERVATION OF THE ELEMENTS AND CONNECTIONS OF THE STRUCTURAL SYSTEMS
<br />AT SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED STRUCTURE FOR
<br />GENERAL CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS. STRUCTURAL
<br />OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE INSPECTIONS REQUIRED
<br />OF THE BUILDING INSPECTOR OR THE DEPUTY INSPECTOR.
<br />2. THE OWNER SHALL EMPLOY AN ENGINEER LICENSED TO PERFORM STRUCTURAL
<br />OBSERVATION IN THE PROJECT JURISDICTION.
<br />3, THE STRUCTURAL OBSERVER SHALL PROVIDE A LETTER TO BE SUBMITTED TO THE
<br />BUILDING OFFICIAL, AS REQUIRED BY THE JURISDICTION, BEFORE THE FIRST SITE
<br />VISIT. THE STRUCTURAL OBSERVER SHALL ALSO INFORM THE OWNER OF THE
<br />REQUIREMENTS FOR A PRECONSTRUCTION MEETING AND SHALL PRESIDE OVER THIS
<br />MEETING.
<br />4. THE OWNER OR OWNER'S REPRESENTATIVE SHALL COORDINATE COMMUNICATION
<br />BETWEEN THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN,
<br />STRUCTURAL OBSERVER, CONTRACTOR, AFFECTED SUBCONTRACTORS AND SPECIAL
<br />INSPECTORS. THE PURPOSE OF THIS COMMUNICATION SHALL BE TO IDENTIFY THE
<br />MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE VERTICAL AND
<br />LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW SCHEDULING OF THE
<br />REQUIRED OBSERVATIONS.
<br />5. REPORTS SHALL BE ISSUED FOR EACH STRUCTURAL OBSERVATION AND ISSUED TO
<br />THE OWNER, ARCHITECT, CONTRACTOR AND BUILDING OFFICIAL. A RECORD OF THE
<br />PRECONSTRUCTION MEETING NOTED ABOVE SHALL BE INCLUDED IN THE FIRST
<br />OBSERVATION REPORT,
<br />6. THE CONTRACTOR SHALL SCHEDULE EACH OBSERVATION AT LEAST TWO WEEKS PRIOR
<br />TO DATE OF THE PROPOSED OBSERVATION.
<br />7. THE STRUCTURAL OBSERVER SHALL PERFORM OBSERVATIONS AT THE FOLLOWING
<br />SIGNIFICANT CONSTRUCTION STAGES:
<br />CONSTRUCTION STAGES ELEMENTS/CONNECTIONS TO BE OBSERVED
<br />a) AT SUBSTANTIAL COMPLETION OF THE PRIMARY STRUCTURE.
<br />SUBMITTALS
<br />1. THE FOLLOWING ITEMS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR
<br />REVIEW AND APPROVAL PRIOR TO FABRICATION/ERECTION/INSTALLATION. THESE
<br />ITEMS ARE IN ADDITION TO ANY SUBMITTAL REQUIREMENTS SPECIFIED ON THESE
<br />PLANS OR IN THE PROJECT SPECIFICATIONS.
<br />STRUCTURAL SUBMITTALS
<br />ITEM
<br />PROD
<br />DATA
<br />SHOP
<br />DWGS
<br />TEST
<br />RESULTS
<br />CALCS
<br />BLDG
<br />DEPT
<br />STRUCTURAL STEEL
<br />-
<br />YES
<br />-
<br />-
<br />-
<br />GROUT, EPDXY, ANCHORS
<br />YES
<br />-
<br />-
<br />-
<br />-
<br />2. "PROD DATA" - SUBMIT ADEQUATE DOCUMENTATION THAT THE PRODUCT PROPOSED
<br />TO BE USED MEETS THE REQUIREMENTS ON THESE PLANS AND THE PROJECT
<br />SPECIFICATIONS.
<br />3. "SHOP DWGS" - SUBMIT COMPLETE SHOP DRAWINGS SUFFICIENT TO SHOW
<br />QUANTITIES AND KINDS OF MATERIALS, METHODS OF ASSEMBLY, AND ALL DATA
<br />REQUIRED FOR FABRICATION, ERECTION, AND INSTALLATION. THE PURPOSE OF THESE
<br />DRAWINGS IS TO DEMONSTRATE THAT THE CONTRACTOR UNDERSTANDS THE DESIGN
<br />CONCEPT DOCUMENTED HEREIN. SUBMITTALS CONSISTING OF DRAWINGS TAKEN
<br />DIRECTLY FROM THESE PLANS WILL NOT BE APPROVED. IF DEVIATIONS,
<br />DISCREPANCIES OR CONFLICTS BETWEEN SHOP DRAWING SUBMITTALS AND THE
<br />CONTRACT DOCUMENTS ARE DISCOVERED, EITHER PRIOR TO OR AFTER REVIEW BY
<br />THE STRUCTURAL ENGINEER, THE DESIGN DRAWINGS AND SPECIFICATIONS SHALL
<br />CONTROL AND SHALL BE FOLLOWED. RESPONSIBILITY FOR ADHERENCE TO THE
<br />CONTRACT DOCUMENTS LIES SOLELY WITH THE CONTRACTOR. DIMENSIONS AND
<br />QUANTITIES ARE NOT REVIEWED BY THE STRUCTURAL ENGINEER AND THEREFORE
<br />MUST BE VERIFIED BY THE CONTRACTOR.
<br />4. "TEST RESULTS" - SUBMIT RESULTS FOR ANY TESTING REQUIRED BY BUILDING CODE
<br />OR THESE PLANS.
<br />SUBMITTALS CONT.
<br />5. "CALCS" - SUBMIT SIGNED AND SEALED PREPARED BY A DESIGN PROFESSIONAL
<br />AUTHORIZED TO PERFORM WORK IN THE PROJECT JURISDICTION. CALCULATIONS
<br />SHALL INDICATE THE MAGNITUDE AND DIRECTION OF ALL LOADS IMPOSED ON THE
<br />BASIC STRUCTURE. THE COMPONENT DESIGNER SHALL BE RESPONSIBLE FOR CODE
<br />CONFORMANCE AND ALL NECESSARY CONNECTIONS NOT SPECIFICALLY CALLED OUT
<br />ON THE ARCHITECTURAL AND STRUCTURAL DRAWINGS.
<br />6. "BLDG DEPT" -- IF CHECKED, THE SUBMITTALS SHALL BE REVIEWED AND APPROVED
<br />BY THE BUILDING OFFICIAL PRIOR TO FABRICATION AND/OR INSTALLATION.
<br />7, THE CONTRACTOR SHALL REVIEW, STAMP AND APPROVE SUBMITTALS PRIOR TO
<br />REVIEW BY THE STRUCTURAL ENGINEER. UNREVIEWED OR UNSTAMPED SUBMITTALS
<br />WILL BE RETURNED TO THE CONTRACTOR UNREVIEWED.
<br />8. THE CONTRACTOR SHALL ALLOW TWO WEEKS FOR REVIEW OF SUBMITTALS.
<br />COMMENTS OR MARKS ON SUBMITTALS ARE A NORMAL AND EXPECTED PART OF THE
<br />SUBMITTAL PROCESS AND SHALL NOT BE USED AS A BASIS FOR CHANGE ORDERS.
<br />TIME REQUIRED TO REVISE AND RESUBMIT ANY SUBMITTAL SHALL BE CONSIDERED
<br />INHERENT IN THE TO THE SUBMITTAL REVIEW PROCESS AND SHALL NOT BE DEEMED
<br />A CHANGE ORDER.
<br />9. RESUBMITTALS SHALL HAVE ALL REVISIONS CLEARLY IDENTIFIED WITH DRAWING
<br />CLOUDS AND REVISION DATES. THE STRUCTURAL ENGINEER SHALL NOT BE
<br />RESPONSIBLE FOR THE REVIEW OF ANY UNMARKED REVISIONS.
<br />10. CONTRACTOR REQUESTED CHANGES OR SUBSTITUTIONS SHALL BE SUBMITTED IN
<br />WRITING TO THE STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR
<br />CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS
<br />REQUIREMENT. CONTRACTOR WILL BE RESPONSIBLE FOR ANY ADDITIONAL
<br />ENGINEERING EFFORT AND ASSOCIATED FEES REQUIRED FOR REVIEW AND APPROVAL
<br />OF REQUESTED CHANGES AND SUBSTITUTIONS.
<br />STRUCTURAL STEEL, MISC. METAL
<br />1. STRUCTURAL STEEL DETAILING, FABRICATION AND ERECTION SHALL CONFORM TO THE
<br />BUILDING CODE AND AISC STANDARDS USING LOADS AS DEFINED IN AISC-360
<br />SECTION B3-3 "DESIGN FOR STRENGTH USING LOAD AND RESISTANCE FACTOR
<br />DESIGN (LRFD)".
<br />2. STRUCTURAL STEEL FABRICATION, ERECTION AND DIMENSIONAL TOLERANCES OF
<br />STRUCTURAL STEEL MEMBERS SHALL CONFORM TO AISC REQUIREMENTS AND THE
<br />PROJECT SPECIFICATIONS.
<br />3. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED
<br />ON THE STRUCTURAL DRAWINGS:
<br />A. WIDE FLANGE SHAPES ASTM A992, Fy = 50 KSI
<br />B. PLATES AND BARS ASTM A36, Fy = 36 KSI
<br />C. CHANNELS AND ANGLES ASTM A36, Fy = 36 KSI
<br />D. HOLLOW ROUND SECTIONS ASTM A500-B, Fy = 42 KSI
<br />E. HOLLOW RECTANGULAR SECTIONS ASTM A500-13, Fy = 46 KSI
<br />F. ROUND PIPE ASTM A53-13, Fy = 35 KSI
<br />G. ANCHOR RODS EMBEDDED IN CONCRETE ASTM F1554 GRADE 36
<br />H. CONNECTION BOLTS A325-N-STD
<br />4. THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS FOR REVIEW
<br />AND APPROVAL PRIOR TO THE START OF FABRICATION.
<br />5. WELDING SHALL BE PERFORMED IN ACCORDANCE WITH AWS REQUIREMENTS. ALL
<br />WELDS SHALL BE PREQUALIFIED IN ACCORDANCE WITH AWS AND AISC STANDARDS.
<br />USE E70XX ELECTRODES, UON.
<br />6. ALL WELDS SHALL BE PERFORMED BY WELDERS CERTIFIED IN THE JURISDICTION
<br />HAVING AUTHORITY OVER THIS PORTION OF THE WORK.
<br />7. WELD LENGTHS CALLED FOR ON THE PLANS ARE THE NET EFFECTIVE LENGTH
<br />REQUIRED. WELD SIZE SHALL BE AISC MINIMUM, UON.
<br />8. BOLTED CONNECTIONS OF MEMBERS MARKED 'SLRS' OR CONNECTIONS NOTED AS
<br />SLIP CRITICAL SHALL BE PRETENSIONED AND SHALL MEET THE REQUIREMENTS FOR A
<br />CLASS A FAYING SURFACE. CONNECTIONS AT THESE MEMBERS SHALL BE MADE USING
<br />STANDARD HOLES IN ALL PLYS.
<br />9. PENETRATIONS OF ANY SIZE IN ANY AREA OF THE MEMBER MUST BE REVIEWED AND
<br />APPROVED BY THE STRUCTURAL ENGINEER.
<br />10. BEAMS AND GIRDERS SHALL NOT SUPPORT PIPING LARGER THAN 10" DIAMETER
<br />WITHOUT THE REVIEW OF THE STRUCTURAL ENGINEER OF RECORD.
<br />11. TENSION CONTROL BOLTS MAY BE SUBSTITUTED FOR THE BOLTS SPECIFIED IN THESE
<br />PLANS AT THE DISCRETION OF THE CONTRACTOR. ASTM F1852 TC BOLTS MAY BE
<br />SUBSTITUTED FOR ASTM A325 BOLTS AND ASTM F2280 TC BOLTS MAY BE
<br />SUBSTITUTED FOR ASTM A490.
<br />
|