Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 45 <br /> I <br /> v. Overhead(general and administrative). <br /> vi. Subcontractor's contract claims (in the same level of detail as specified herein is <br /> required for all Subcontractor's contract claims);and <br /> vii. Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the following <br /> language: <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of Contract <br /> Time,if any,made herein for Work on this Contract is a true and complete statement of <br /> the factual basis of the Contract Claim and all actual costs incurred and time sought,and <br /> is fully documented and supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> 12.3 FALSE OR OMITTED INFORMATION <br /> The Contractor waives each Contract Claim for which it presents material information that it knows,or in <br /> the exercise of reasonable care should know,is false,or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case,Contractor shall reimburse the Owner for any and all fees <br /> and expenses incurred in investigating any such Contract Claim. <br /> 12.4 REMEDIES <br /> 12.4.1 General <br /> If a Contract Claim has merit in whole or in part,then Contractor's sole remedies shall be those provided <br /> in this subsection. Contractor must timely and strictly comply with the requirements of 10.NOTICE TO <br /> OWNER, 11.DIFFERING SITE CONDITIONS,12.CONTRACT CLAIMS and all other General <br /> Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to <br /> 5.2.2.2 Extensions of Contract Time.Failure to comply strictly and timely shall be deemed a waiver of <br /> the Contract Claim. <br /> 12.4.2 Extra Work <br /> 1 12.4.2.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work,the adjustment shall <br /> be calculated and paid as provided in 9.5.ADJUSTMENT OF CONTRACT SUM.This amount <br /> includes jobsite and home office Overheads for such Work,including any schedule delays relating to such <br /> Work. Therefore,no compensation in addition to that provided in 9.6.FORCE ACCOUNT shall be <br /> paid for such things as extended Overhead or other costs or damages. <br /> 00 7200 - 45 GENERAL CONDITIONS <br />