My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 26 02 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> REQUEST FOR INFORMATION <br /> To Engineer: Owner's <br /> Representative: <br /> From Contractor: Document Reference: <br /> Signature: (Drawing Sheet,Detail No./Spec.Section) <br /> I <br /> • Architectural • Civil • Structural • Mechanical • Electrical • Other <br /> Request/Recommended Solution: <br /> 111 • Attachments <br /> Date Required For Response: Initiated By: <br /> I (Name) (Firm) <br /> Architect's Response: <br /> I <br /> • Attachments <br /> Response By: Firm: Date: <br /> NOTE:This is not an authorization to proceed with work involving additional cost and/or time.Notification must be given in accordance with the Contract <br /> Documents if any response causes any change to the Contract Sum and/or Contract Time. <br /> Copies: • Owner's Representative • Consultant • Other • File <br /> END OF SECTION 01 26 02 <br /> I <br /> I <br /> I <br /> 01 26 02 - 1 RFI TEMPLATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.