My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 29 73 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 29 73 -SCHEDULE OF VALUES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: Administrative and procedural requirements for processing and <br /> submitting Schedule of Values. <br /> 1 B. Related Requirements: <br /> 1. Division 00 - Conditions of the Contract for additional requirements relating to <br /> provisions of this Section <br /> 2. Section 01 32 16 - Construction Progress Documentation <br /> 3. Section 01 33 00 - Submittal Procedures <br /> 4. Section 01 74 19 - Construction Waste Management and disposal <br /> 5. Section 01 77 00 - Closeout Procedures <br /> 6. Section 01 78 39 - Project Record Documents <br /> 1.2 REFERENCES <br /> 1.3 SCHEDULE OF VALUES SUBMITTAL PROCEDURES <br /> A. Submit a Schedule of Values for review by Architect and Owner within 14 days after <br /> Notice to Proceed and no less than 30 days prior to submittal of first Application for <br /> Payment. <br /> 1 B. Submit updated Schedule of Values with each subsequent Application for Payment. <br /> C. Submit revised Schedule of Values reflecting Owner accepted Change Orders and other <br /> Modifications to Contract that affect Contract Sum or Contract Time. <br /> D. Owner reserves right to reject Schedule of Values submittals that appear front loaded or <br /> do not reasonably approximate anticipated cost of identified line items. <br /> 1.4 FORMAT <br /> 1 A. Forms: AIA Form G703 - Application and Certificate for Payment Continuation Sheet, <br /> electronic media facsimile, or forms as accepted by Owner. <br /> 1 B. Format Size: 8-1/2 inch by 11 inch or 11 inch by 17 inch. <br /> 1.5 GENERAL REQUIREMENTS <br /> 1 01 29 73 - 1 SCHEDULE OF VALUES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.