My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 30 00- 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> C. Submittals requiring the Owners or Local Jurisdictions approval shall be made <br /> sufficiently in advance so that approval may be made by the Construction <br /> Manager before commencement of related work. Submittals required for <br /> Qualification of Materials or Product types that require a long lead time for <br /> delivery shall be made sufficiently in advance to allow acceptance by the <br /> Construction Manager before Materials or Products are ordered. Rejection of <br /> any submittal required by this Section will not be accepted as a basis for any <br /> claim for delay. <br /> D. Submittals requiring the Owners or Local Jurisdictions approval will be returned <br /> or responded to as specified in the General Provisions. <br /> E. Revise and resubmit submittals as required. Identify all changes made since <br /> previous submittal. <br /> F. Supplemental submittals initiated by the Contractor for consideration of corrective <br /> procedures shall contain sufficient data for review. Make supplemental <br /> submittals in the same manner as initial submittals. <br /> 2.3 QUANTITIES <br /> A. Submittals requiring the Owners or Local Jurisdictions approval shall be made in <br /> the following quantities: <br /> 1. Six (6) prints of each Shop Drawing and Working Drawing. <br /> 2. Six (6) copies of manufacturers' standard schematic drawings. <br /> 3. Six (6) copies of manufacturers' calculations and standard data. <br /> 4. Six (6) copies of manufacturers' printed installation, erection, application, <br /> and placing instructions. <br /> 5. Six (6) copies of inspection reports, test reports and certificates of <br /> compliance. <br /> 6. Submit three (3) Samples, unless otherwise specified in a specific <br /> Specification Section, of each item, one of which will be retained by the <br /> Owner. Reviewed samples which may be used in Work are indicated in <br /> individual Specification Sections. <br /> B. Submittals not requiring the Owners approval, sent only for record, shall be made <br /> in the following quantities: <br /> 1. One (1) print of each Shop Drawing and Working Drawing. <br /> 2. One (1) copy of manufacturers' standard schematic drawings. <br /> 01 30 00 - 5 SUBMITTALS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.