My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 30 00 - 7 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 3.2 DESIGN ENGINEER'S REVIEW <br /> A. Submittals will be reviewed for conformance to requirements of the Contract <br /> Documents, Plans and Specifications. Review of a separate item will not <br /> constitute review of an assembly in which the item functions. Review will not <br /> relieve the Contractor from his responsibility for accuracy of submittals, for <br /> conformity of submittals to requirements of the Contract Documents, Plans and <br /> Specifications, for compatibility of described product with contiguous products <br /> and the rest of the system, or for prosecution and completion of the Contract in <br /> accordance with the Plans and Specifications. <br /> B. Review stamp will be affixed, action block will be marked, and stamp will be <br /> signed and dated. <br /> C. The Design Engineer will review the submittals for general conformance with the <br /> Contract Documents and mark, sign and date the review stamp. <br /> D. The action block stamp shall have the following meanings: <br /> 1. The mark "NO EXCEPTION TAKEN" means that every illustration and <br /> 1 description appears to conform to the respective requirements of the <br /> Contract Documents; that fabrication, assembly, manufacture, installation, <br /> application, and erection of the illustrated and described product may <br /> proceed; and that the submittal need not be resubmitted. <br /> 2. The mark "EXCEPTIONS NOTED - RESUBMITTAL NOT REQUIRED" <br /> means that every illustration and description appears to conform to the <br /> respective requirements of the Contract Documents upon incorporation of <br /> the reviewer's corrections into the work, and that fabrication, assembly, <br /> manufacture, installation, application, and erection of the illustrated and <br /> described product may proceed by incorporating the noted items into the <br /> work. Submittals so marked need not be resubmitted unless the <br /> Contractor challenges the reviewer's exception. Reviewer's corrections <br /> shall be shown in the as-built drawings. <br /> 3. The mark "EXCEPTIONS NOTED - RESUBMITTAL REQUIRED " means <br /> that the illustrations and descriptions appear to conform to the respective <br /> requirements of the Contract Documents (upon incorporation of the <br /> reviewer's corrections) and that fabrication, assembly, manufacture, <br /> installation, application, and erection of the illustrated and described <br /> product may proceed by incorporating the noted items into the work <br /> unless the Contractor challenges the reviewer's exception. <br /> 4. The mark "REJECTED - RESUBMITTAL REQUIRED " is a rejection, and <br /> means that the submittal is deficient to the degree that the reviewer <br /> cannot correct the submittal with a reasonable degree of effort, has not <br /> 01 30 00 - 7 SUBMITTALS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.