My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 32 16- 2 <br /> Inductive Charging Infrastructure for Everett Transit I <br /> B. Schedule shall be submitted electronic. Acceptable format .mmp or as otherwise <br /> approved by Owner. <br /> C. Review by the Owner or Owner's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, order, <br /> precedence and succession of activities or Contractor's ability to complete the Work in a <br /> timely manner. <br /> D. The review/approval of any schedule shall not transfer any of the Contractor's <br /> responsibilities to the Owner. <br /> E. Subcontractors shall review all schedules prior to submittal. At the Owner's option and <br /> sole discretion, Owner may require Contractor to obtain written acceptance of each <br /> schedule by subcontractors as practical and feasible, as the schedule relates to <br /> subcontractors' work. <br /> I <br /> 1.4 UPDATES <br /> A. The Project Construction Schedule will be reviewed and updated at each progress I <br /> meeting. All changes to the project schedule of more than three (3) working days shall <br /> be documented. The Schedule shall be updated to show measures required to bring <br /> project back on schedule. The Contractor alone shall remain responsible for adjusting <br /> forces, equipment, and work schedules to ensure completion of the work within the <br /> Contract Time. Any mistakes or errors in any schedule, including, but not limited to, <br /> mistakes or errors of logic, order, precedence, and duration, are and remain the <br /> Contractor's. <br /> B. Should any activity not be completed by the stated scheduled date, the Owner will have <br /> the right to require the Contractor to expedite completion of the activity by whatever <br /> means appropriate and necessary, without additional compensation to the Contractor. <br /> C. The Schedule shall be used to justify time extension days requested by the Contractor. <br /> For additional days requested, the Schedule shall be detailed enough to identify the work <br /> item(s) affected and the relationship to the changed or added work. <br /> D. Schedule shall be provided during the construction meetings. Schedule shall be on 1 <br /> 11x17 paper or as otherwise approved by Owner and shall show current work progress. <br /> 1.5 OWNER PROVIDED MATERIALS <br /> A. All items to be provided by the Owner shall be incorporated into the schedule. The <br /> 111 <br /> schedule shall show when the materials are required to be delivered to the project and <br /> when the materials will be installed. These materials are to be included in the preliminary <br /> schedule, upon review; owner will confirm lead time for materials and delivery dates. , <br /> B. Contractor failure to include owner provided materials into the schedule shall be <br /> responsible for all delays to the work or failure to notify the owner of tasks dependent <br /> upon the owner furnished materials shall constitute a waiver by the contractor of any , <br /> 01 32 16 - 2 CONSTRUCTION PROGRESS SCHEDULE ' <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.