My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 63 25 - 2 <br /> Inductive Charging Infrastructure for Everett Transit I <br /> H. Cost Savings? <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately, and for the required work to make corrections thereof. <br /> Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: I <br /> Signature Date <br /> Printed <br /> I <br /> Firm <br /> I <br /> Address <br /> Telephone <br /> I <br /> For use by Architect/Engineer: <br /> Accepted Accepted as Noted Not Accepted Received Too <br /> Late <br /> BY: Date: <br /> Remarks: <br /> For use by Owner: <br /> 1 <br /> Accepted Accepted as Noted Not Accepted Received Too Late I <br /> Project Manager Date I <br /> Remarks: <br /> I <br /> END OF SECTION 00 63 25 I <br /> 00 63 25 - 2 SUBSTITUTION REQUEST FORM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.