My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 3 <br /> Notice to Proceed: The written Notice from the Owner or Owner's Representative to the Contractor <br /> authorizing and directing the Contractor to proceed with the Work and establishing the date on which the <br /> Contract Time begins. Multiple and partial Notices to Proceed may be issued on a single Project. <br /> Over-absorbed Overhead: Over recovery of fixed indirect costs that occurs when a Contractor performs <br /> more overall Work than it otherwise would have performed. <br /> Overhead: For the purpose of calculating additional compensation under this section of the Contract, <br /> Overhead shall include only those costs that are expended for the administration of the business as a <br /> ' whole. Such costs usually accrue or are incurred due to the passage of time, and cannot be traced to a <br /> particular project or Contract. Examples of possible Overhead costs include,but are not limited to, <br /> General and Administrative salaries and benefits,rent,general company insurance(exclusive of insurance <br /> ' on owned equipment that is directly job costed),depreciation on office facilities,utilities,maintenance, <br /> office supplies,general company accounting and legal fees(exclusive of amounts expended directly on <br /> any specific project),personal property taxes,general company business licenses,dues and subscriptions. <br /> ' The following costs and expenses are excluded from the definition and calculation of Overhead. <br /> Overhead costs that vary substantially with the volume of Work performed(as measured by billings)shall <br /> not be included in Overhead for the purpose of determining additional compensation for Extended or <br /> Unabsorbed Home Office Overhead or both. <br /> ' Examples of costs that are not included in Overhead include,but are not limited to,travel and business <br /> meetings,telephones,professional fees expended for the benefit of a specific project,union welfare <br /> benefits,payroll taxes and equipment rental. <br /> ' If related party transactions are included in a Contractor's Overhead,they shall be explicitly identified as <br /> related party transactions and shall not exceed amounts that would be incurred in an arms-length <br /> transaction for the provision of the same or similar goods and services. If such transactions exist and the <br /> amounts paid by the Contractor and included in Overhead are in excess of that which would normally be <br /> expended in an arms-length transaction,an adjustment,in the form of a reduction in the amount for <br /> calculation purposes,shall be included in any calculation in determining the amount of Allocable <br /> ' Overhead. <br /> Overhead shall not include any cost directly attributable to a particular project. If a cost can be traced to a <br /> particular Contract,the Contractor may not classify the cost as Overhead. <br /> Indirect or home office costs that vary substantially with the amount of Work performed shall not be <br /> included in the group of costs comprising Overhead. <br /> 1 Overhead shall not include costs specifically disallowed by Federal Acquisition Regulations, Subpart 31.2 <br /> —Contracts with Commercial Organizations,or its successor. Further,"Overhead"shall not include the <br /> costs of"field support services"that are more closely direct costs in nature,regardless of the manner in <br /> which the Contractor normally accounts for such costs. An example of such disallowed cost would be for <br /> ' material handling and expediting,which are costs incurred for the direct support and benefit of specific <br /> project(s). <br /> In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples of specific costs <br /> not allowed in a calculation under this section of the Contract include,but are not limited to,Incentive <br /> Compensation paid to personnel classified as Overhead and otherwise includable under this section of <br /> Contract,travel and business meetings,employer paid benefits and taxes on direct payroll costs of any <br /> project, insurance costs directly identifiable to a specific project,penalties,and costs incurred regarding <br /> company owned equipment normally classified as a direct project costs. <br /> Owner: The City of Everett,Washington. "Owner"and the"City"mean the same. <br /> ' Owner's Representative: The person designated in writing and employed or retained by the Owner to <br /> act as its representative at the construction Site and to perform construction inspection service and <br /> administrative functions relating to this Contract. The terms"Owner's Representative","Engineer"and <br /> "Architect"are interchangeable. <br /> 00 7200 - 3 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.