STATEMENT OF SPECIAL NSPECTIONS 2012 IBC SPECIAL INSPECTION REQUIRED BY 2012 IBC CONCRETE CONSTRUCTION (IBC 1705.3 & 1705.12.1): UJ <br /> 1. IN ACCORDANCE TO SECTION 1704.2 OF THE 2012 INTERNATIONAL BUILDING CODE INDICATED ITEMS REQUIRING SPECIAL INSPECTION ARE IDENTIFIED UNDER COLUMNS "FREQUENCY OF INSPECTION" AS "PERIODIC" OR ITEM FREQUENCY OF INSPECTION INSTRUCTIONS <br /> (IBC), THE OWNER, OR THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CONTINUOUS". IF NO BOX IS CHECKED, EITHER THE TASK DOES NOT EXIST OR DOES NOT NEED ANY SPECIAL INSPECTION. V <br /> CHARGE ACTING AS THE OWNER'S AGENT, IS REQUIRED TO HIRE AND INDEPENDENT <br /> TESTING/INSPECTION AGENCY TO PERFORM REQUIRED SPECIAL INSPECTIONS. REINFORCING STEEL CONTINUOUS ❑ PERIODIC ® VERIFY PRIOR TO PLACING CONCRETE THAT <br /> SOILS CONSTRUCTION (IBC 1 705.6): REINFORCING IS OF SPECIFIED TYPE, GRADE AND <br /> 2. THIS STATEMENT OF SPECIAL INSPECTIONS SUBMITTED BELOW IS FULFILLMENT OF SIZE; THAT IT IS FREE OF OIL, DIRT AND RUST; it <br /> THE REQUIREMENTS OF 2012 IBC SECTIONS 1704 AND 1705. ITEM FREQUENCY OF INSPECTION INSTRUCTIONS THAT IT IS LOCATED AND SPACED PROPERLY; <br /> THAT HOOKS, BEND, TIES, STIRRUPS ANDcc <br /> 3. SPECIAL INSPECTIONS AND TESTING WILL BE PERFORMED IN ACCORDANCE WITH THE <br /> APPROVED PLANS AND SPECIFICATIONS, THIS STATEMENT, IBC 2012 CHAPTER 17 AND SUPPLEMENTAL REINFORCEMENT ARE PLACED <br /> AISC ED SECTION "N5". VERIFY SUBGRADE IS ADEQUATE TO CONTINUOUS ® PERIODIC ❑ PRIOR TO PLACEMENT OF CONCRETE. CORRECTLY; THAT LAP LENGTHS, STAGGER AND 0 <br /> ACHIEVE DESIGN BEARING CAPACITY OFFSETS ARE PROVIDED; AND THAT ALL <br /> 4. THE INSPECTOR SHALL OBSERVE THE WORK FOR COMPLIANCE WITH THE JURISDICTION MECHANICAL CONNECTIONS ARE INSTALLED PER <br /> APPROVED PLANS, SPECIFICATIONS, AND APPLICABLE PROVISIONS OF THE IBC, THE THE MANUFACTURER'S INSTRUCTIONS AND/OR LV <br /> ARCHITECTS/ENGINEER'S RENEWED SHOP DRAWINGS, AND/OR PLACEMENT DRAWINGS, VERIFY EXCAVATIONS EXTEND TO CONTINUOUS ❑ PERIODIC ® PRIOR TO PLACEMENT OF COMPACTED FILL EVALUATION REPORT. I— <br /> MAY BE USED ONLY AS AN AID TO INSPECTIONS. PROPER DEPTH AND MATERIAL OR CONCRETE. <br /> a. CONTINUOUS SPECIAL INSPECTION — THE FULL—TIME OBSERVATION OF WORK VERIFY THAT SUBGRADE HAS BEEN CONTINUOUS ® PERIODIC ❑ PRIOR TO PLACEMENT OF COMPACTED FILL. CAST—IN BOLTS & EMBEDS CONTINUOUS ® PERIODIC ❑ INSPECTION OF ANCHORS OR EMBEDS CAST IN ›— <br /> REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS APPROPRIATELY PREPARED PRIOR TO CONCRETE IS REQUIRED WHEN ALLOWABLE J <br /> PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. PLACING COMPACTED FILL LOADS HAVE BEEN INCREASED OR WHERE <br /> STRENGTH DESIGN IS USED. Q <br /> b. PERIODIC SPECIAL INSPECTION — THE PART—TIME OR INTERMITTENT W <br /> OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED PERFORM CLASSIFICATION AND CONTINUOUS ® PERIODIC ❑ ALL MATERIALS SHALL BE CHECKED AT <br /> SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING TESTING OF COMPACTED FILL EACH LIFT FOR PROPER CLASSIFICATIONS POST—INSTALLED ANCHORS OR CONTINUOUS ® PERIODIC ❑ ALL POST—INSTALLED ANCHORS/DOWELS SHALL p <br /> PERFORMED AND AT THE COMPLETION OF THE WORK. MATERIALS AND GRADATIONS NOT LESS THAN ONCE DOWELS BE SPECIALLY INSPECTED AS REQUIRED BY THE <br /> 5. THE SPECIAL INSPECTOR SHALL COMPLETE A DAILY REPORT FOR EACH DAYS FOR EACH 10,0001'1 OF SURFACE AREA. APPROVED ICC—ES REPORT, O <br /> INSPECTIONS. THE DAILY REPORTS SHALL REMAIN AT THE JOB SITE WITH THE cz <br /> CONTRACTOR FOR THE BUILDING DIVISION'S INSPECTOR. THE REPORTS SHALL VERIFY PROPER MATERIALS, CONTINUOUS ® PERIODIC ❑ <br /> INCLUDE THE FOLLOWING. DENSITIES AND LIFT THICKNESSES USE OF REQUIRED MIX DESIGN CONTINUOUS CZ PERIODIC ❑ VERIFY THAT ALL MIXES USED COMPLY WITH THE <br /> F- <br /> a. NAME OF SPECIAL INSPECTOR AND DATE THE INSPECTION WAS PERFORMED. DURING PLACEMENT AND APPROVED CONSTRUCTION DOCUMENTS; ACI C <br /> COMPACTION 318;CH 4, 5.2-5.4; AND IBC 19004.3, 19.13.2, c <br /> b. DESCRIPTION OF THE INSPECTIONS, WITH LOCATIONS AND TESTS PERFORMED. 1913.3. <br /> CK <br /> c. LISTING ANY NON—CONFORMING ITEMS. <br /> CONCRETE SAMPLING FOR STRENGTH CONTINUOUS ® PERIODIC ❑ W <br /> d. INCLUDE HOW ITEMS WERE RESOLVED OR UNRESOLVED. TESTS, SLUMP, AIR CONTENT, AND TEMPERATURE <br /> TEMPERATURE cc <br /> e. LIST ANY CHANGES OR CORRECTIONS TO NON—CONFORMING ISSUES AUTHORIZED <br /> BY THE ENGINEER, ARCHITECT, OR BUILDING DIVISION'S INSPECTORS. O <br /> CONCRETE PLACEMENT CONTINUOUS ❑ PERIODIC ® li. <br /> 6. THE INSPECTOR SHALL BRING NON—CONFORMING ITEMS TO THE IMMEDIATE ATTENTION OF <br /> THE CONTRACTOR, AND NOTE ALL SUCH ITEMS IN THE DAILY REPORT. IF ANY ITEM IS NOT W <br /> RESOLVED IN A TIMELY MANNER AND IS ABOUT TO BE INCORPORATED IN THE WORK, THE D <br /> SPECIAL INSPECTORS SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD. CURING TEMPERATURE AND CONTINUOUS ® PERIODIC ❑ VERIFY THAT THE AMBIENT TEMPERATURE FOR CO <br /> TECHNIQUES CONCRETE IS KEPT AT > 50'F FOR AT LEAST 7 Ci) <br /> 7. THE INSPECTION AGENCY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND DAYS AFTER PLACEMENT. HIGH—EARLY— — <br /> INSPECTIONS PERFORMED DIRECTLY TO THE BUILDING DIVISION, ENGINEER OF RECORD, STRENGTH CONCRETE SHALL BE KEPT AT >50'F <br /> AND/OR OTHERS AS DESIGNATED. FOR AT LEAST 3 DAYS. ACCELERATED CURING <br /> METHODS MAY BE USED (SEE ACI 318:5.11.3). <br /> 8. THE INSPECTION AGENCY SHALL SUBMIT A FINAL SIGNED AND SEALED REPORT TO THE THE AMBIENT TEMPERATURE FOR SHOTCRETE <br /> BUILDING DIVISION STATING THAT ALL ITEMS REQUIRING SPECIAL INSPECTIONS AND TESTING SHALL BE >40'F FOR THE SAME PERIOD OF TIME <br /> WERE FULFILLED, ALL DISCREPANCIES WERE CORRECTED OR RESOLVED, AND ALL WORK AS NOTED FOR CONCRETE. FOR ATEL SHALL BE <br /> REQUIRING SPECIAL INSPECTIONS IS IN CONFORMANCE WITH THE APPROVED DESIGN KEPT CONTINUOUSLY MOIST FOR AT LEAST 24 <br /> DRAWINGS AND SPECIFICATIONS AND APPLICABLE CODES. ANY ITEMS UNRESOLVED OR HOURS AFTER NFORCEMENT, ALL CONCRETE <br /> DISCREPANCIES IN COVERAGE (I.E. MISSED INSPECTIONS, PERIODIC INSPECTIONS WHEN MATERIALS, REINFORCEMENT, FORMS, FILLERS, <br /> CONTINUOUS WAS REQUIRED, ETC) SHALL BE SPECIFICALLY ITEMIZED IN THE REPORT. AND GROUND SHALL BE FREE FROM FROST. IN <br /> HOT WEATHER CONDITIONS ENSURE THAT <br /> 9. THE STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER APPROPRIATE MEASURES ARE TAKEN TO AVOID <br /> OF RECORD WITH THE UNDERSTANDING THAT THE BUILDING OFFICIALS WILL: PLASTIC SHRINKAGE CRACKING AND THAT THE <br /> SPECIFIED WATER/CEMENT RATIO IS NOT <br /> EXCEEDED. <br /> a. REVIEW AND APPROVE THE QUALIFICATIONS OF THE SPECIAL INSPECTORS WHO <br /> WILL PERFORM THE INSPECTIONS. <br /> ERECTION OF PRECAST CONCRETE CONTINUOUS ❑ PERIODIC ® VERIFY THAT ALL PRECAST ELEMENTS ARE LIFTED, <br /> b. MONITOR SPECIAL INSPECTION ACTIVITIES ON THE JOB SITE TO ASSURE THAT ASSEMBLED AND BRACED IN ACCORDANCE WITH <br /> THE SPECIAL INSPECTORS ARE QUALIFIED AND PERFORMING THEIR DUTIES AS THE APPROVED CONSTRUCTION DOCUMENTS. <br /> CALLED FOR IN THE STATEMENT OF SPECIAL INSPECTION. <br /> c. REVIEW SUBMITTED INSPECTION REPORTS. FORMWORK CONTINUOUS ❑ PERIODIC ® VERIFY THAT THE FORMS ARE PLACED PLUMB <br /> AND CONFORM TO THE SHAPES, LINES, AND <br /> d. PERFORM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. DIMENSIONS OF THE MEMBERS AS REQUIRED BY <br /> THE APPROVED CONSTRUCTION DOCUMENTS. <br /> e. WILL ISSUE CERTIFICATION OF OCCUPANCY AFTER ALL SPECIAL INSPECTION <br /> REPORTS AND THE FINAL SPECIAL INSPECTION REPORT HAVE BEEN SUBMITTED <br /> AND ACCEPTED. <br /> sotIAy, <br /> a.0 owwBA asNNo <br /> b I De ate_, a <br /> u <br /> 900 SW 16th Street Suite 307 SVONAt.Ea` <br /> Renton,Washington 98057 David P. Balawajder <br /> SYM REVISION BY APPROVED DATE SYM RENISON BY APPROVED DATE DRAWN OAI� WA PE 28184 0 <br /> UE wABXAM ACCEPTABILITY KRW 05/30/14 SUBTffLE CURRENT REVISION SYMBOL DATE <br /> A ISSUE FOR PERMIT KRW DPB 05/30/14 .E SPETHIS DESIGOR <br /> CIfIC.4TI0N NSAAPPROVEO DPBaKLD OS/30/14 GENERAL NOTES W2534622 05/30/14 <br /> - elLAFACW,AW® TBLE SHEET o <br /> �ara®awc. o APPROVED BY DEFT. DATE SW/EWB 05/30/14 40-58 <br /> .197 CHECKED S2ao <br /> APPROVED SITE 40-YD JOB NO. COMP ND. o <br /> 16950 <br /> �'c^E.iAViW,o APPROVED STRUCTURAL MASTER EVERETT, WA DWG ND. 40—YD—S2a <br /> (PAPER SPACE)SEE:40-YD0D_55-C10.DWG <br />