My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3885-22
>
Ordinances
>
Ordinance 3885-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 9:04:47 AM
Creation date
7/26/2022 9:04:44 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3885-22
Date
7/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br /> WASHINGTON <br /> ORDINANCE NO. 3885-22 <br /> An Ordinance creating a special construction project entitled "Thornton A.Sullivan Dome Roof <br /> Replacement", Fund 354, Program 076,to accumulate costs for the project in the amount of$30,000. <br /> WHEREAS, <br /> A. The City Council recognizes the need to maintain City facilities. <br /> B. The 2019 facilities condition assessment identified deficiencies with the Thornton A. Sullivan <br /> dome roof and concluded the roof has exceeded its useful life. <br /> C. The City Council recognizes the need to repair and replace the roof of the Thornton A. Sullivan <br /> dome located at 11621 Silver Lake Road, Everett WA 98208. <br /> NOW,THEREFORE,THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1. A special construction fund is hereby established as Fund 354, Program 076, "Thornton A. <br /> Sullivan Dome Roof Replacement and shall be entitled "Thornton A. Sullivan Dome Roof Replacement"to <br /> accumulate all costs for the project. <br /> Section 2. Authorization is hereby granted to the Parks& Facilities Director under the administration of <br /> the Mayor, to assume full responsibility for conducting all tasks and performing all necessary steps to <br /> accomplish the actions authorized by this Ordinance. <br /> Section 3. The cost of the design of this project is $30,000 not including costs related to construction. <br /> Section4: The sum of $30,000 is hereby appropriated to Fund 354 Program 076, Thornton.A. Sullivan <br /> Dome Roof Replacement Fund. <br /> A. Use of Funds <br /> Design $30,000 <br /> Total $30,000 <br /> B. Source of Funds <br /> Fund 354 Program 076 $30,000 <br /> Total $30,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.