Laserfiche WebLink
• • <br /> PUBLIC WORKS PERMIT Date Applied: 6/23/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2106-076 <br /> EVERETT <br /> 3200 Cedar Street, 2' Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> WASHINGTON <br /> 425-257-8810 Public Works F,e ,90 . <br /> „, <br /> ",9707;:vu'i v., <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS A L <br /> CITY OF EVERETT MARK HARRISON <br /> 3200 CEDAR ST 802 E MUKILTEO BLVD JUN 2 3 2022 ' <br /> EVERETT,WA,98201 EVERETT,WA,98203 <br /> PHONE: PHONE;4252578378 r ARC:HTVFD <br /> TAX PARCEL ID#:00464700008100 SITE ADDRESS:1127 OLYMPIC f- " ' =1,,f0` <br /> DESCRIPTION:STORMWATER REVIEW FOR HOWARTH PARK PLAYGROUND <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours In advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811, <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job- <br /> site at all times, <br /> 5. Inspections are required for all stages of construction,Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required Inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector or the <br /> approved SWPPP/TESC Plan.Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8, Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced Impervious surfaces will be <br /> managed on-site In a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements <br /> and the improvements located therein, <br /> 11,Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be <br /> obtained from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure,Please allow 1-2 weeks for TSU permit issuance from the date of <br /> application. <br /> 12,This permit must be finaled in order to close out this permit/grant a Certificate of Occu .Req * final I ection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection -. '-st • rm ,hen • •ms <br /> have been completed. <br /> Public Works Permit Fee Breakdown: /eafi AUG 05 2021 <br /> Misc.Minor Permits(Drainage Work)....$25,00 <br /> PW Site Inspection $20.00 -:/�/'t Olen <br /> City of Everett Official Use Only Cl �w '0 j WILE P( NT OF,CONDITIONS <br /> 4 �{i asing this mlt a mencing work,the owner/applicant <br /> p�r •hold and,. armless the City of Everett from any <br /> an c i f'?. ) e , ts,expenses,or causes of action that <br /> mayarise i'df ' s �on and maintenance of the <br /> O l// ,, G 2/ Improvement or differ right•of-way use here to applied for and further <br /> / agrees to remove same upon notice from the City and to replace <br /> Approved for Construction,Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED By THIS PERMIT MUST BE STARTED WiTHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DIUGENTLY PURSUED TO COMPLETION,THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECTOVER 180-DAY DURATION,EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE, <br />