|
z,:t
<br /> cry® O22O #
<br /> F /
<br /> Response to Public works Department Review Comments es t,... 1
<br /> t-es
<br /> November 25, 2020
<br /> To: Mr. Andrew Huang
<br /> Development Technician P.E., LEED AP BD+C
<br /> 3200 Cedar Street Everett, WA 98201 Everett, WA 98201
<br /> 425.257.8810
<br /> Re: The Milk House, Tenant Improvement
<br /> 4405 Rucker Ave
<br /> Plan Check No: B2009-025, First Building Review
<br /> Dear Sir,
<br /> I am writing a response letter per Mr. Andrew Huang comments of the City Of Everett Public Works
<br /> Department dated October 20th, 2020. For the proposed Milk House, Tenant Improvement
<br /> City of Everett:
<br /> 1. At the (3) angled parking spaces just South of the coffee building
<br /> 2812 response] Signs have been added to address this comment See note 21 on site
<br /> plan drawing Al.
<br /> City of Everett:
<br /> 2. At the parking spaces along the North property line: ....
<br /> [2812 response] Curbs have been added to address this comment. See note 20 on
<br /> site plan drawing Al.
<br /> Sincerely,
<br /> �1 , '
<br /> Paul Doug as (2812 Architecture)
<br /> r,F. z,r„„-.,,,,,,,,, „ . .77. _ .,,,,,„ r.v r,.x:t:,, „s.:-. .--,,,4, .. ,.:u �I,•4 �Na.,. o:,4•Q,.;4 ' .=4,:e 9'x_,.,-S,.A i S.,`R,,,;r. e;-',S'�,
<br /> 2812 Colby Avenue Everett WA 98201
<br /> P(425)252-2153 www.2812architecture.com
<br />
|