My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4405 RUCKER AVE MILKHOUSE COFFEE CO 2022-08-04
>
Address Records
>
RUCKER AVE
>
4405
>
MILKHOUSE COFFEE CO
>
4405 RUCKER AVE MILKHOUSE COFFEE CO 2022-08-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2022 8:11:14 AM
Creation date
7/27/2022 11:59:32 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4405
Tenant Name
MILKHOUSE COFFEE CO
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIWVORKS PERMIT Date Applied: 10/8/2020 <br /> City o verett Permit Services <br /> PublieWorks Permit#: PW2010-015 <br /> EVERETT 3200 Cedar Street, 2 Floor Everett, WA 98201 Associated Bldg Permit#: B2009-025 <br /> Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $314.21 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MILKHOUSE LLC PAUL DOUGLAS <br /> 4610 1/2 EVERGREEN WAY <br /> EVERETT,WA,98203 <br /> PHONE: PHONE:4252522153 <br /> TAX PARCEL ID#:00407800500300 SITE ADDRESS:4405 RUCKER AVE <br /> DESCRIPTION: PARKING AND LANDSCAPING FOR COFFEE HOUSE <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated XX/XX/2020.Approved plans must remain on <br /> job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan.Remove upon completion of the project <br /> prior to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site in a <br /> manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the improvements located <br /> therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW <br /> 24-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of the <br /> right-of-way for municipal purposes. <br /> 12. At the North parking spaces,place wheelstops 2'-6"from end of parking stalls. Car bumpers shall not overhang into the road. Applicant must <br /> understand that this parking is in the ROW. In the future event that the City of Everett needs access,this parking may be forfeited. <br /> 13. At the South(3)diagonal spaces:as currently designed,these(3)parking spaces shall be back in only,shall only bor employees and shall <br /> be signed as such. s r <br /> jr—z, <br /> Public Works Permit Fee Breakdown: �~ <br /> Paving(798SF) $45.00 DEC I b 20 II <br /> Misc.Minor Permits $25.00 <br /> PW Plan Review $20.00 C! 1� �, L <br /> PW Site Inspection $20.00 �. " � .� <br /> Stormwater System Development Fee $204.21 �'�rmr(Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> 41AM, qaa t912/2/20 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.