My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1503 VIRGINIA AVE 2022-07-27
>
Address Records
>
VIRGINIA AVE
>
1503
>
1503 VIRGINIA AVE 2022-07-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 2:38:53 PM
Creation date
7/27/2022 2:38:41 PM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
1503
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(E)WOOD FRAMED �SN S M ;•, <br /> FLOOR SYSTEM, t <br /> FIELD VERIFY STEM WALL FOOTING SCHEDULE <br /> REINFORCEMENT 'y„ <br /> FOOTING WIDTH PER PLAN FOOTING DEPTH rove Eg' <br /> LONGITUDINAL TRANSVERSE ••••" <br /> 8"MIN THICKNESS, <br /> (E)CONC STEM WALL 1'-4" 8" 2#4,CONT N/A <br /> 2'-0" 8" 3#4,CONT N/A <br /> — I� T/STEM WALL=� 3'-O" 1'-0" 4,44,CONT #4@12"O.0 <br /> FIELDVARIES VERIFY <br /> i 5/8"O ANCHOR BOLT W/3"X3"X0.229"PLATE EXISTING NEW <br /> i T/FIN GRADE= STEM WALL STEM WALL <br /> CONTRACTOR TO VERIFY I ' .nu=nu=on=n' 2„ WASHER.SPACED PER SW SCHEDULE T.O.C.=+0.0" #4 X 2'-4" REBAR, DRILL & EPDXY <br /> • Ilnllnil=11iulllin= (4"X4"X0.229"AT ALL DOUBLE SIDED EXISTING 4" INTO THE EXISTING STEM WALL W/ <br /> 1/2" SHEARWALLS) FRAMING #4H ® 18" O.C. SIMPSON SET-XP <br /> •' rn$II- fiii-f.y. MAX <br /> =o . I, REF FRAMING AND SHEAR DETAILS FOR T/FLOOR <br /> o nu=nu=mi=lil, PER ARCH <br /> w 0 p=:III=IIII=:Til=1 II FRAMING AND NAILING REQUIREMENTS \ <br /> =U w • 1111=IIILIIII=IIII`- �; " ' :>\ <br /> z qa I it=ill=-nn=Ill=m ►:4. \ T/GONG W^ o <br /> a ,. =11111111=g11=1111= a <br /> ,,zO _TIE 111:-1111=_.n1IIIl ..MIME" <br /> c, ~ 111=1111I11i111I= F Z 0 <br /> , __-=n=N IIIW = #4H AT 12"O.C. z o z /� 18 0. P <br /> ..._.. tl_I =...'4El " • _ _iiiillii.E 111Rlull — # 0.C. 2 — <br /> I, i Il T/GONGFTG z J #4 AT C. TY I-- W <br /> m• ulgu rill-III '••^ mr=nll-nl FIELD VERIFY x z -III—III 4VIAT 18" [ g" / <br /> uI1=11n-III I gi=uu-m WEDGE ANCHORS a -I I— 8" co Z W <br /> •'--ITu-ill....' •' • •. •u=1i11_liu= PER STABIL-LOG m= 11- <br /> 1Tu-lnn-ill •^ =1 4 _Zo BACK FILL TO T/FOOTING MIN Z 0 <br /> _e-il-all " u- =fir REQUIREMENTS a e= <br /> •"=1111= II=1N ^ 11--1- 1111=11I1= "'_' w \ 0 O <br /> _ n IIO iiI, i a w =I IT". 1. \(2) #4 IN FTG MIDI 1'-10" LAP I <br /> (E)CONTINUOUS , � -� SPLICE I <br /> CONC FOOTING a u mo k; "CLR <br /> NOTES: — — —'Ip���� — — #4 X 2' 4" REBAR, DRILL & EPDXY <br /> 1.CONTRACTOR TO VERIFY NOTED MINIMUM EXISTING FOUNDATION STABIL-LOC CONCENTRIC PIER -1 ____ I III III— i . "--'11= 4" INTO THE EXISTING FOOTING, MID <br /> DIMENSIONS PRIOR TO INSTALLATION.ENGINEER-OF-RECORD TO BE , ASSEMBLY PER R&R FOUNDATION ER PLA `\ REINFORCEMENT PER STEM <br /> DEPTH SIMPSON SET-XP EPDXY <br /> NOTIFIEDPRIORTCOMPONETSSIFMINIMUMSNOTMET. SPECIALIST TO CONFORM TO ESR4121 WALL FOOTING SCHEDULE, CONNECTIONS SIMILAR ID TALL BSMT <br /> 2.ALL ASSEMBLY COMPONENTS SHALL BE FULLY SEALED BYA PER PLAN <br /> CORROSION RESISTANT SYSTEM.THIS INCLUDES ALL FINAL CUT UNO ON PLAN WALL APPLICATIONS, AND FOOTING -- <br /> ENDS AND DRILLED HOLES.CORROSION PREVENTION COATING CONNECTION NOT REQ'D IF ADJACENT <br /> SYSTEM BY OTHERS.GALVANIZATION PER ASTM 153/A123 IS FOOTING IS HELD HIGH W/0 STEPS TO <br /> RECOMMENDED. I3 NOTE: Contractor to ensure that the new foundation bears on competent native BTM OF DEEP FOUNDATION ' <br /> 3.AT CUT INSTALLATION POCKET ALL EXPOSED STEEL <br /> REINFORCEMENT SHALL BE SEALED OR COATED TO PREVENT aIW soils or structural fill. Structural fill to be compacted to 95%density in REVISIONS _ <br /> CORROSION. �,� QI_esra,P-M71 c,,.rr e_ <br /> accordance with ASTM D-1557. <br /> I DRIVEN PILE INSTALLATION DETAIL 2 NEW STEM WALL & FOOTING SCHEDULE 3 STEM WALL RETROFIT DOWELING <br /> (E)WOOD BEAM <br /> / [NOTE 4] PROJECT NAME <br /> 1503 VIRGINIA AVE <br /> EVERETT,WA <br /> 98201 <br /> S200817-5 <br /> WOOD POST PER PLAN ZT <br /> SIMPSON PCZ POST [NOTE 4] M RT <br /> CAP[NOTE 2] 04/24/2021 <br /> __,` SIMPSON EPB POST <br /> BASE[NOTE 2] <br /> 1'-6"DIAM PRECAST <br /> CT,m CONCRETE PAD PER MFR <br /> [NOTE 1] <br /> ch <br /> g z T/GRADE <br /> m _,„ INTERIOR 1. <br /> III= _P,I,PIn= III?iiI <br /> ='111=1111E11111111=1111-Dill=1111 1111E <br /> 111-1111=11DI=11D1=Dill= '• <br /> J <br /> NOTES: Q <br /> 1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF fc=2,500PSI. w <br /> 2. BEAM&COLUMN FASTENER QUANTITY AND SIZE PER SIMPSON STRONG-TIE. <br /> 3. MINIMUM POST BASE EMBEDMENT DEPTH PER ESR-3050. z <br /> O_ <br /> 4. WOOD MEMBERS MUST BE EITHER SAWN OR ENGINEERED LUMBER RECOGNIZED IN AN L i_q ��p4 0 <br /> ICC-ES EVALUATION REPORT. 6 �i Q 6 <br /> i EV�Ea�E�F �� PERMIT co <br /> 4 NEW POST BASE 5 NOT USED 6 NOT USED ° <br /> `� a <br />
The URL can be used to link to this page
Your browser does not support the video tag.