My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2315 VIRGINIA AVE 2022-07-27
>
Address Records
>
VIRGINIA AVE
>
2315
>
2315 VIRGINIA AVE 2022-07-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 2:42:53 PM
Creation date
7/27/2022 2:42:39 PM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
2315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESID TIAL PHOTOVOLTAIC PERMI I 'PLICATION (Page 1 of 2) <br /> CITY OF EVERETT PERMIT SERVICES <br /> EVERETT 3200 CEDAR STREET, EVERETT,WA 98201 <br /> (P)425-257-8810 I FAX 425-257-8857 I (E)everetteps@everettwa.gov I www.everettwa.gov/permits <br /> WASHINGTON <br /> PROJECT SITE INFORMATION <br /> PROJECT ADDRESS: 2315 Virginia Ave Everett,WA 98201 PARCEL#: 00401649800700 <br /> BUILDING TYPE: ❑SFR-DETACHED ✓❑SFR-ATTACHED/TOWNHOUSE ❑ DUPLEX <br /> CONTACT''INFORMATION <br /> OWNER NAME: Bryan&Masumi Jenks <br /> CONTRACTOR NAME: CapStone Solutions,INC. <br /> CONTRACTOR LIC.#(REQUIRED): CC CAPSTS1883OS CITY OF EVERETT BUSINESS LIC.#(REQUIRED): 58078 <br /> PRIMARY CONTACT: OWNER ❑✓ CONTRACTOR ❑OTHER(Please Specify) <br /> CONTACT NAME: CONTACT PHONE: (360)325-5345 <br /> Eric Marquette CONTACT EMAIL: eric.marquette@capstonesolar.com <br /> SOLAR PANEL APPLICATION INFORMATION <br /> PV SYSTEM DESCRIPTION (include manufacturer and model,#of PV modules and inverters): Installation of residential rooftop solar PV, <br /> 9.49 kW, with automatic rapid shutdown. This is a 26 module system, using Hyundai HiA-S365Hl panels, with 26 SolarEdge <br /> P370 optimizers, and 1 StorEdge SE7600A-US inverter. Please refer to the design for all spec sheets. <br /> BUILDING PERMIT CHECKLIST <br /> DETERMINE IF YOUR PROJECT QUALIFIES FOR AN OVER-THE-COUNTER BUILDING PERMIT: <br /> If you answer yes to all of the below questions, the project qualifies for an over-the-counter building permit. YES NO <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or townhouse not more than three <br /> stories above grade or detached accessory structure that is code compliant to setbacks and height, or code allows Q✓ ❑ <br /> expansion of nonconformity for solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by the local jurisdition. ✓� <br /> 3. Rooftop is made from lightweight material such as a single layer of composition shingles, metal roofing, lightweight 7 <br /> masonry, or cedar shingles. El <br /> 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] 0✓ <br /> El <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must ❑ <br /> be obtained from the Authority having Jurisdiction to administer the electrical code. [IRC M2302.2] <br /> 6. The installation shall meet the requiremetns of the International Fire Code as amended by WA State. [IRC M2302.2] n <br /> 7. The PV system is designed for the wind speed of the local area, and will be installed per the manufacturer's ❑ <br /> specifications. [IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(1)] <br /> 9. The total dead load of modules, supports, mountings, raceways, and all other appurtenances weigh no more than four <br /> pounds per square foot. [IRC M2302.2.1(3)]. Enter total dead load of system (lbs/sq.ft.):2.63 <br /> 10. To address uplift, modules are mounted no higher than 18"above the surface of the roofing to which they are affixed. <br /> [IRC M2302.2.1(4)] <br /> 11. Supports for solar modules are installed to spread the dead load across as many roof-framing members as needed to E <br /> ensure that no point load exceeds fifty(50) pounds. [IRC M2302.2.1(5)] <br /> 12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire-retardant ❑ <br /> treated wood equivalent to that required for the roof construction. [IRC M2302.2.1] <br /> 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, rodents, and insects. [IRC M2302.2.2] 7 0 <br /> 14. PV modules are listed and leveled with a fire classification in accordance with UL 1703. [IRC M2302.2.3] ❑ <br /> Comments: <br /> PLEASE FILL OUT A CITY OF EVERETT BUILDING PERMIT APPLICATION IF YOU QUALIFY FOR AN OTC BUILDING PERMIT. <br /> City of Everett Official Use Only <br /> ASSOCIATED <br /> /BUILDING <br /> /PERMIT# <br /> Continue on to Page 2 of Application B �O <br /> (Revised 9/30/2016) <br />
The URL can be used to link to this page
Your browser does not support the video tag.