My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> t <br /> ITEM DESCRIPTION YES NO <br /> 27. Precast Railroad Crossings - Concrete Crossing Structure <br /> Slabs. X <br /> ' 28. 12, 18 and 26 inch Standard Precast Prestressed Girder— <br /> Standard Precast Prestressed Girder for use in structures. <br /> Fabricator plant has annual approval of methods and materials <br /> to X <br /> be used. Shop Drawing to be provided for approval prior to <br /> casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> ' 29. Prestressed Concrete Girder Series 4-14 - Prestressed Concrete <br /> Girders for use in structures. Fabricator plant has annual <br /> approval <br /> of methods and materials to be used. Shop Drawing to be X <br /> provided for approval prior to casting girders. <br /> ' See Std. Spec. Section 6-02.3(25)A <br /> 30. Prestressed Tri-Beam Girder- Prestressed Tri-Beam Girders for <br /> use in structures. Fabricator plant has annual approval of <br /> ' methods and materials to be used. Shop Drawing to be <br /> provided X <br /> for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> 31. Prestressed Precast Hollow-Core Slab— Precast Prestressed <br /> Hollow-core slab for use in structures. Fabricator plant has <br /> annual <br /> approval of methods and materials to be used. Shop Drawing to X <br /> be provided for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A. <br /> 32. Prestressed-Bulb Tee Girder- Bulb Tee Prestressed Girder for <br /> ' use in structures. Fabricator plant has annual approval of <br /> methods and materials to be used. Shop Drawing to be <br /> provided X <br /> ' for approval prior to casting girders. <br /> See Std. Spec. Section 6-02.3(25)A <br /> ' 33. Monument Case and Cover X <br /> See Std. Plan. <br /> 1 <br /> Supplemental to Wage Rates 5 <br /> 03/03/2022 Edition, Published February 1, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.