My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Washington State Department of Labor and Industries I <br /> Policy Statements <br /> (Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.) I <br /> WAC 296-127-018 Agency filings affecting this section <br /> Coverage and exemptions of workers involved in the production and delivery of <br /> gravel, concrete, asphalt, or similar materials. I <br /> (1) The materials covered under this section include but are not limited to: Sand, gravel, <br /> crushed rock, concrete, asphalt, or other similar materials. <br /> (2) All workers, regardless of by whom employed, are subject to the provisions of I <br /> chapter 39.12 RCW when they perform any or all of the following functions: <br /> (a)They deliver or discharge any of the above-listed materials to a public works project I <br /> site: <br /> (i) At one or more point(s) directly upon the location where the material will be 1 <br /> incorporated into the project; or <br /> (ii) At multiple points at the project; or I <br /> (iii) Adjacent to the location and coordinated with the incorporation of those materials. I <br /> (b) They wait at or near a public works project site to perform any tasks subject to this <br /> section of the rule. <br /> (c) They remove any materials from a public works construction site pursuant to I <br /> contract requirements or specifications (e.g., excavated materials, materials from <br /> demolished structures, clean-up materials, etc.). I <br /> (d)They work in a materials production facility(e.g., batch plant, borrow pit, rock quarry, <br /> etc.,) which is established for a public works project for the specific, but not necessarily I <br /> exclusive, purpose of supplying materials for the project. <br /> (e) They deliver concrete to a public works site regardless of the method of I <br /> incorporation. <br /> (f) They assist or participate in the incorporation of any materials into the public works <br /> project. I <br /> I <br /> I <br /> Supplemental to Wage Rates 10 I <br /> 03/03/2022 Edition, Published February 1, 2022 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.