Laserfiche WebLink
©#4(TYP.) TOP OF POST ). 3'(IN)PIPE CAP NOTES <br /> .�._. 1. See Standard Plan J-20.26 for Accessible Pedestrian Pushbutton details. <br /> 1 #4 1 O 2. Where shown in the plans,install plaque(R10-32P)"PUSH BUTTON FOR 2 SECONDS FOR EXTRA <br /> GROUNDING CONNECTION- j ¢ <br /> w CROSSING TIME"above the Accessible Pedestrian Signal(APS)assembly.Add 14"(in)to the PPB post height to <br /> ( 0 <br /> SEE DETAIL j .-ce " accommodate plaque and leave a 2"(in)space between signs. <br /> p �° ACCESSIBLE PEDESTRIAN i ,,,23. Mounting distances vary between manufacturers.See manufacturers recommendations for mounting information. <br /> ®r" SIGNAL(APS)ASSEMBLY 4. Junction Box serving the Standard shall preferably be located 5'-0"(10'-0"Max.)from the Standard. <br /> i __._-_._-_ 5. Supplemental Grounding Conductor shall be non-insulated#4 AWG stranded copper and shall be clamped to vertical rebar <br /> IF- with a connector suitable for use embedded in concrete:Provide 3'-0"min.slack.Attach to pole grounding stud with a full <br /> 1 a FIELD DRILL AND TAP FOR i $ circle crimp-on connector(crimped with a manufacturer recommended crimper), <br /> `___ 1/4-20 THREAD BOLT(TYP.) j <br /> J.- __-_------..N 6. Two button installation may require adaptor(s). <br /> o <br /> 0 2 1/2"CLR. 13 1/2" 7" i- --------r------------q OF PUSHBUTTON PIPE CAP 1/8 * <br /> 1/4"(IN)STEEL <br /> (rm.) 1/2'(IN)STEEL i--- TOP OF POST STAINLESS STEEL <br /> w PLATE i PLATE FLAT WASHER(TYP.)--- - 1-8" 5/8"(IN)DIAM. w j 1 1/2"(IN)DIAM. <br /> SQUARE 5/8"(IN)DIAM, HOLE <br /> m HOLE(TYP.) 6 .© i i HOLE <br /> DIAM. HOLE(TYP.) <br /> PLAN VIEW <br /> 8"(IN)DIAM. O w i h�-r \Q _ _ - <br /> BOLT CIRCLE Illi �. 1/4"(IN).1.1/4"(IN)LONG <br /> b to i STAINLESS STEEL <br /> D I I • \ 1' POST WALL THREADED STUD <br /> ii \ v ' I <br /> 3/4"(IN) '� i ° \ I EQUIPMENT GROUNDING THREE 1/4"(IN)STAINLESS <br /> 0 <br /> CHAMFER �O =#3 / CONDUCTOR AND FULL CIRCLE STEEL HEX NUTS <br /> (TYP) 0#4(TYP,) a 6"(IN)DIAM. 0 CRIMP-ON CONNECTOR-CRIMPED <br /> BOLT CIRCLE WITH A MANUFACTURER'S <br /> = / 3"(IN)STEEL PIPE <br /> GRADE 1 12" 3 9/16"(IN)DIAM. 3"(IN)STEEL PIPE • , -(SCHEDULE 40) RECOMMENDED CRIMPER <br /> FINISHED <br /> CLR. HOLE (SCHEDULE 40) GROUNDING CONNECTION DETAIL <br /> I _ maim BASE PLATE DETAIL tD ANCHOR BOLT TEMPLATE * WELD STUD TO POLE WALL TO MAXIMUM EXTENT <br /> T• r,, POSSIBLE-1/2"(IN)MINIMUM WELD <br /> FO I. ro TOP OF i EQUIPMENT CONFIGURATIONS VARY AMONG DIFFERENT MANUFACTURERS <br /> ' C f SIDEWALK I EQUIPMENT GROUNDING <br /> z \ ' J= GROUNDING CONDUCTOR <br /> CONDUCTOR BASE PLATE ASSEMBLY- <br /> WITH <br /> N I �y w • . , 1/2"(IN1/2" )FFLAT WASHER,IAMETER TETWO EACH REQUL HEAVY HEX IRED PER <br /> j 3/16" ANCHOR BOLT-MINIMUM OF TWO THREADS ABOVE <br /> 2 1/2"(IN)CLR I i _ TOP OF NUT OR 5/8"(IN)MAXIMUM(TYP.) <br /> R)C) •(` PREMOLDED JOINT FILLER j 1/2"(IN)STEEL BASE PLATE I ICI <br /> -.,I C " I i 12"(IN)BASE PLATE- ���' - \\\\\\\ <br /> ©#4 TYP. i SEE DETAIL :.tt+-:J •. AFTER GROUT PAD-INSTALL <br /> �-^iL i (TYP.) <br /> B i 0#4(7YP.) ( ) ..f 1/6 ' �,• STANDARD <br /> MBING <br /> -_T R 3/8'IN DRAIN TUBE <br /> ANCHOR BOLT TEMPLATE ASSEMBLY d TOP OF CURB • <br /> i p �� � • 1tLINT <br /> ANCHOR BOLT TEMPLATE-TWO REQUIRED e, 1 _ e ;'- (IN)LONG <br /> • • O CONDUIT COUPLING^INSTALL `_3•' niv■,.: PVC STUBOUT ,r <br /> 1/2'(IN)z 24'(IN)FULL THREAD ANCHOR • �"k"'''�)( ! • TOP OF FLUSH WRH TOP OF FOUNDATION. •k_, 'u <br /> BOLTS-FOUR REQUIRED '-'" (DO NOT GLUE PVC STUBOUT)FOUNDATION. <br /> 'r.' vtiR°�g Ot'AtS9/, '��� <br /> 1"(IN)DIAMETER 1/2'(IN)DIAM.STEEL HEAVY HEX NUTS- t° ' " �„ - 1 12'CLR. SIDEWALK SECTION B c ' ,� "' tit <br /> ELECTRICAL CONDUIT —'`; —_4-_ H_ (TYP.) r O d .> <br /> FOUR REQUIRED PER ANCHOR BOLT '�; - �'- Z <br /> • <br /> FLAT WASHERS-FOUR -- <br /> REQUIRED PER ANCHOR BOLT • .'v I I"- <br /> IL I`' -die• 4t <br /> SQUARE �q I ;� 1,' PREMOLDED to "GI STBR 1. <br /> O )• I • <br /> ANCHOR FILLER ss/ONA <br /> • JOINT BAG <br /> SECTION A bto OR BOLT L <br /> r••I I .' TEMPLATE ASSEMBLY <br /> REINFORCING STEEL BENDING DIAGRAM �- ".--t—.1r'`�-F. \V <br /> � V p#a(rYP.) ACCESSIBLE PEDESTRIAN <br /> SEE STD.SPEC.NDING N. .1(2) ` — PUSHBUTTON WITH <br /> FOR BENDING DIAMETERS ' CURB BASE <br /> 1 135' <br /> HOOK mr ///� STANDARD PLAN J-20.11-03 <br /> O (TYP.) 1'-8" <br /> "' .)...._1'(IN)DIAMETER - - SHEET 1 OF 2 SHEETS <br /> #4 <br /> URIT CAL <br /> APPROVED FOR PUBLICATION <br /> 0#4 h CONDUIT <br /> 1'-6' ---- -- <br /> r <br /> r-r ELEVATION STATE DESMNFACaEER <br /> DIMENSIONS ARE OUT TO OUT TYPE PPB STANDARD DETAILS PERSPECTIVE VIEW Wi <br /> Washington Slate Deportment of Transportation <br /> s — 111111 — In 11111 — Ma 1111111 — r — OM OM — as MI MN MI <br />