My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 feet beyond the toe of a fill and 10 feet beyond the top of a cut unless otherwise <br /> 2 shown in the Plans. <br /> 3 <br /> 4 4. Establish grading limits, placing slope stakes at centerline increments not more <br /> 5 than 50 feet apart. Establish offset reference to all slope stakes. If Global 111 <br /> 6 Positioning Satellite (GPS) Machine Controls are used to provide grade control, <br /> 7 then slope stakes may be omitted at the discretion of the Contractor <br /> 8 <br /> 9 5. Establish the horizontal and vertical location of all drainage features, placing <br /> 1 <br /> 10 offset stakes to all drainage structures and to pipes at a horizontal interval not <br /> 11 greater than 25 feet. <br /> 12 <br /> 13 6. Establish roadbed and surfacing elevations by placing stakes at the top of <br /> 14 subgrade and at the top of each course of surfacing. Subgrade and surfacing <br /> 15 stakes shall be set at horizontal intervals not greater than 50 feet in tangent 1 <br /> 16 sections, 25 feet in curve sections with a radius less than 300 feet, and at 10- <br /> 17 foot intervals in intersection radii with a radius less than 10 feet. Transversely, <br /> 18 stakes shall be placed at all locations where the roadway slope changes and at I <br /> 19 additional points such that the transverse spacing of stakes is not more than 12 <br /> 20 feet. If GPS Machine Controls are used to provide grade control, then roadbed <br /> 21 and surfacing stakes may be omitted at the discretion of the Contractor. <br /> 22III <br /> 23 7. Establish intermediate elevation benchmarks as needed to check work <br /> 24 throughout the project. <br /> 25 <br /> 26 8. Provide references for paving pins at 25-foot intervals or provide simultaneous <br /> 27 surveying to establish location and elevation of paving pins as they are being <br /> 28 placed. I <br /> 29 <br /> 30 9. For all other types of construction included in this provision, (including but not <br /> 31 limited to channelization and pavement marking, illumination and signals, I <br /> 32 guardrails and barriers, and signing) provide staking and layout as necessary to <br /> 33 adequately locate, construct, and check the specific construction activity. <br /> 34 <br /> 35 10. Contractor shall determine if changes are needed to the profiles or roadway <br /> 36 sections shown in the Contract Plans in order to achieve proper smoothness <br /> 37 and drainage where matching into existing features, such as a smooth transition <br /> 38 from new pavement to existing pavement. The Contractor shall submit these <br /> 39 changes to the Engineer for review and approval 10 days prior to the beginning <br /> 40 of work. <br /> 41 I 42 The Contractor shall provide the Contracting Agency copies of any calculations and <br /> 43 staking data when requested by the Engineer. <br /> 44 <br /> 45 The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 46 <br /> I <br /> 1 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP12 of SP68 MAY 2,2022 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.