My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 path. The Engineer will evaluate the Type A Progress Schedule and approve or return the <br /> 2 schedule for corrections within 15 calendar days of receiving the submittal. I <br /> 3 <br /> 4 1-08.4.RTF <br /> 5 1-08.4 Prosecution of Work I <br /> 6 <br /> 7 Delete this section and replace it with the following: <br /> 8 I <br /> 9 1-08.4 Notice to Proceed and Prosecution of Work <br /> 10 (July 23, 2015 APWA GSP) <br /> 11 I 12 Notice to Proceed will be given after the contract has been executed and the contract <br /> 13 bond and evidence of insurance have been approved and filed by the Contracting <br /> 14 Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> 15 has been given by the Engineer. The Contractor shall commence construction activities <br /> 16 on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> 17 approved in writing. The Contractor shall diligently pursue the work to the physical <br /> 18 completion date within the time specified in the contract. Voluntary shutdown or slowing I <br /> 19 of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> 20 complete the work within the time(s) specified in the contract. <br /> 21 I <br /> 22 When shown in the Plans, the first order of work shall be the installation of high visibility <br /> 23 fencing to delineate all areas for protection or restoration, as described in the Contract. <br /> 24 Installation of high visibility fencing adjacent to the roadway shall occur after the I <br /> 25 placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). <br /> 26 Upon construction of the fencing, the Contractor shall request the Engineer to inspect the <br /> 27 fence. No other work shall be performed on the site until the Contracting Agency has <br /> 28 accepted the installation of high visibility fencing, as described in the Contract. I <br /> 29 <br /> 30 1-08.5.GR1 <br /> 31 Time for Completion <br /> 32 <br /> 33 1-08.5.INST2.GR1 <br /> 34 Section 1-08.5 is supplemented with the following: I <br /> 35 <br /> 36 f1-08.5.OPT7.FR1.docx <br /> 37 (March 13, 1995) <br /> 38 This project shall be physically completed within *** thirty-five (35) *** working days. I <br /> 39 <br /> 40 1-08.5.OptionA.RTF <br /> 41 1-08.5 Time for Completion I <br /> 42 (November 30, 2018 APWA GSP, Option A) <br /> 43 <br /> 44 Revise the third and fourth paragraphs to read: <br /> 45 I <br /> 46 Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> 47 <br /> 48 Each working day shall be charged to the contract as it occurs, until the contract work is I <br /> 49 physically complete. If substantial completion has been granted and all the authorized <br /> 50 working days have been used, charging of working days will cease. Each week the <br /> 1 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP34 of SP68 MAY 2,2022 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.