I <br /> I <br /> 2 3 When the Contract Work has progressed to Substantial Completion as defined in the <br /> Contract, the Engineer may determine the Contract Work is Substantially Complete. The <br /> 4 Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br /> I 5 overruns in Contract time occurring after the date so established, the formula for <br /> 6 liquidated damages shown above will not apply. For overruns in Contract time occurring <br /> 7 after the Substantial Completion Date, liquidated damages shall be assessed on the <br /> I <br /> 8 basis of direct engineering and related costs assignable to the project until the actual <br /> 9 Physical Completion Date of all the Contract Work. The Contractor shall complete the <br /> 10 remaining Work as promptly as possible. Upon request by the Project Engineer, the <br /> 11 Contractor shall furnish a written schedule for completing the physical Work on the <br /> 12 13 Contract. <br /> 14 1-09.GR 1 <br /> I 15 Measurement and Payment <br /> 16 <br /> 17 1-09.6.RTF <br /> I 18 1-09.6 Force Account <br /> 19 (October 10, 2008 APWA GSP) <br /> 20 <br /> 21 Supplement this section with the following: <br /> I <br /> 22 <br /> 23 The Contracting Agency has estimated and included in the Proposal, dollar amounts for <br /> 24 all items to be paid per force account, only to provide a common proposal for Bidders. All <br /> I <br /> 25 such dollar amounts are to become a part of Contractor's total bid. However, the <br /> 26 Contracting Agency does not warrant expressly or by implication, that the actual amount <br /> 27 of work will correspond with those estimates. Payment will be made on the basis of the <br /> I 28 amount of work actually authorized by Engineer. <br /> 29 <br /> 30 GSL 1-09.9(Payments).docx <br /> I <br /> 31 1-09.9 Payments <br /> 32 (March 13, 2012 APWA GSP) <br /> 33 <br /> I34 Delete the first four paragraphs and replace them with the following: <br /> 35 <br /> 36 The basis of payment will be the actual quantities of Work performed according to the <br /> I <br /> 37 Contract and as specified for payment. <br /> 38 <br /> 39 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> I <br /> 40 41 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 42 include a basis for incremental payments as part of the respective Specification. Absent <br /> I <br /> 43 44 a lump sum breakdown, the Project Engineer will make a determination based on <br /> information available. The Project Engineer's determination of the cost of work shall be <br /> 45 final. <br /> I 46 <br /> 47 Progress payments for completed work and material on hand will be based upon <br /> 48 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 1 49 established at the preconstruction conference. <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> I <br /> WORK ORDER 3749 Page SP37 of SP68 MAY 2,2022 <br />