My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> INSTRUCTIONS TO BIDDERS <br /> 1.0 Design Engineer <br /> Questions and inquiries about these Contract Provisions should be directed to the attention of Gina Loring, <br /> (425) 257-7290 or gloring@everettwa.gov. <br /> 2.0 Bidder's Check List <br /> The bidder's attention is directed to the following City-provided forms which must be executed in full as <br /> required and submitted with the bid: <br /> 1. Proposal: The lump sum and unit price items must be shown in the space provided. Show unit prices <br /> in figures. <br /> 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Subcontractor List: To be filled in by the Bidder. <br /> 4. Disadvantaged/Women's Business Enterprise Form: To be filled in and signed by the bidder. <br /> 5. Non-Collusion Declaration: To be submitted with the bid. <br /> 6. Bid Bond: This form is to be executed by the Bidder and the surety company unless bid is accompanied <br /> by a certified check or cashier's check. The amount of this bond shall be not less than five percent(5%) <br /> of the total amount bid and may be shown in dollars or on a percentage basis. Cash will not be <br /> accepted. <br /> 7. Proposal For Incorporating Recycled Materials Into The Project: To be filled in and signed by the <br /> Ibidder. <br /> Failure to complete the aforementioned forms and to submit said forms with the bid may be due cause for <br /> rejection of bid. <br /> 3.0 Pre-Award Forms <br /> The following form is required to be signed and submitted prior to award of Contract: <br /> 1. Certification of Compliance with Wage Payment Statutes: To be filled in and signed. This certification <br /> is not required to be submitted with the bid proposal and may be submitted after bid opening. The <br /> Contract cannot be awarded without this certification. <br /> 4.0 Contract Forms <br /> The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful bidder in duplicate within twenty(20)calendar <br /> days after the award date. <br /> 1 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS INSTRUCTIONS TO BIDDERS <br /> WORK ORDER 3749 Page 1 of 2 APRIL 6,2022 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.