My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 TABLE OF CONTENTS OF THE SPECIAL PROVISIONS <br /> 2 <br /> I 3 <br /> 4 <br /> I 5 INTRODUCTION 1 <br /> 6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 7 SPECIAL PROVISIONS <br /> 8 DIVISION 1 <br /> I9 GENERAL REQUIREMENTS <br /> 10 DESCRIPTION OF WORK 1 <br /> I11 Definitions 2 <br /> 12 BID PROCEDURES AND CONDITIONS 4 <br /> I 13 1-02.2 Plans and Specifications 4 <br /> 14 Examination of Plans, Specifications and Site of Work 4 <br /> 15 General 4 <br /> 16 Proposal Forms 5 <br /> 17 Preparation of Proposal 5 <br /> I18 Recycled Materials Proposal 6 <br /> 19 1-02.9 Delivery of Proposal 6 <br /> I20 Withdrawing, Revising, or Supplementing Proposal 6 <br /> 21 Irregular Proposals 7 <br /> I22 Disqualification of Bidders 8 <br /> 23 Pre Award Information 8 <br /> I 24 Identical Bid Totals9 <br /> 25 Execution of Contract 9 <br /> I 26 Judicial Review 10 <br /> 27 Coordination of Contract Documents, Plans, Special Provisions, 10 <br /> 28 CONTROL OF WORK 10 <br /> I29 Conformity With And Deviations From Plans And Stakes 10 <br /> 30 Contractor Surveying - Roadway 11 <br /> I31 Contractor Surveying —ADA Features 13 <br /> 32 Removal of Defective and Unauthorized Work 14 <br /> I33 Final Inspection 15 <br /> IINTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS TOC OF THE SPECIAL PROVISIONS <br /> WORK ORDER 3749 A MAY 2,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.