Laserfiche WebLink
I <br /> 1 8-22.4 Measurement <br /> 2 <br /> 3 The measurement for"Curb Paint" will be per linear foot of curb. <br /> 4 <br /> 5 8-22.5 Payment <br /> 6 <br /> 7 "Curb Paint", per linear foot. <br /> 8 <br /> 9 <br /> 10 GKK 8-33 PRIVATE IMPROVEMENT RESTORATION.RTF <br /> 11 (******) <br /> 12 <br /> 13 8-33 PRIVATE IMPROVEMENT RESTORATION 1 <br /> 14 Section 8-33 is new and is supplemented with the following: <br /> 15 <br /> 16 8-33.1 Description <br /> 17 <br /> 18 This work consists of removing and restoring of certain private improvements to conform to I <br /> 19 the new requirements due to construction. Restoration of existing special private <br /> 20 improvements including, but not limited to, brick or stone walkways, decorative concrete walks <br /> 21 or driveways, concrete masonry or stone walls, rockery's, fences, landscape plantings, <br /> 22 including but not limited to, hedges, trees, flowerbeds, irrigation systems, yard lighting, <br /> 23 rockeries, retaining walls, or steps. <br /> 24 <br /> 25 8-33.2 Vacant <br /> 26 <br /> 27 8-33.3 Construction Requirements <br /> 28 <br /> 29 Where shown on the plans, or as directed by the Engineer, existing private improvements that <br /> 30 require relocation or modification, shall be restored to the satisfaction of the property owner <br /> 31 and the Engineer. <br /> 32 Private property damaged or destroyed due to the Contractor's negligence shall be removed <br /> 33 and replaced in kind at the Contractor's expense. <br /> 34 <br /> 35 8-33.4 Vacant <br /> 36 <br /> 37 8-33.5 Payment <br /> 38 "Private Improvement Restoration," Force Account, as provided in Section 1-09.6. <br /> 39 <br /> 40 To provide a common Proposal for all Bidders, the Contracting Agency has entered an amount <br /> 41 in the Proposal to become a part of the Contractor's total Bid. <br /> 111 <br /> 42 <br /> 43 <br /> 44 END DIVISION8.RTF <br /> 45 <br /> 46 END DIVISION 8 <br /> 47 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP66 of SP68 MAY 2,2022 <br />