|
:: _
<br /> -•'-: . CITY OF EVERETT,WASHINGTON
<br /> •
<br /> CONTRACT PROVISIONS FOR
<br /> I
<br /> - ::•:INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS
<br /> • • WORK ORDER 3749 : :,:.• • ...::
<br /> •
<br /> 'PROPOSAL .
<br /> •
<br /> To the'City:Councif- . •
<br /> -
<br /> Everett,Washington -
<br /> I •
<br /> The undersigned bidder declares that it:has'carefuliy examined the Plans and Specifications, Notice to Contractors,
<br /> I instructions to. Bidders,.,Standard:.Specifications,:..General Provisions;:.Special:Provisions,. Appendix, Proposal, and
<br /> Contract for the:construction::of :new pedestrian access facilities:and;associated::appurtenances_ between Alta
<br /> Drive/Interurban-Trail,to Beaumont Drive;sand Colby:Avenue:Includes a new crosswalk:on Colby;Avenue'at Emma:Yule
<br /> Neighborhood Park with a Rectangular Rapid Flashing Beacons, raised median :refuge::island with pedestrian cut-•
<br /> I through,'two.ADA.ramps and other:such work as maybe necessary,.in accordance with:the.Specificatiohs,as shown on
<br /> the P:lans;..•that•the::bidder. has made such investigations•as are necessary'to determine .the conditions to be
<br /> encountered, and that if this,.Proposal is accepted the..bidder:.will enter into a contract with the City:of:.Everett,
<br /> Washington, in the form:of..Contract hereto annexed,will;.to the:extent required, provide the necessary equipment;
<br /> tools, apparatus;and other means of construction';and will furnish all labor and materials asspecifted::in these•Contract
<br /> Documents,or,called for,in the:plans,or necessary to complete the:work in the:manner herein;specified an.d.according.
<br /> to the::requirements.of the Engineer,:..
<br /> IThe undersigned bidder certifies that this Pro p sal is iri all respects fair and is made without collusion On the parf of
<br /> any person,firth or corporation mentioned below, and no officer or employee_:of the City of gverett.is personally:or
<br /> I financially interested,'directly.or indirectly,in the: roposar in any• Pl ony purchase of or sale of any materiels or supplies for
<br /> the work:to which it relates;or any portion of the profits,thereof:
<br /> The undersigned bidder agrees:that they will:complete the work,:from'the date of written.Notice to Proceed.in all
<br /> respects within thirty-five_(35):working days: If the.bidder`does not complete the work in the.specified working days
<br /> after written.Not►ce to Proceed, the.bidder will pay liquidated.damages to the City in the arriount specified in the
<br /> Contract.
<br /> I .. . ,
<br /> Accornpanying thisProposal is a'bid bond;or certified;check,or:cashier.'s check:in;the`amount of:five:percen % of.the
<br /> Proposal according to the conditions;of the"No tice`to Contractors" and'.`instructions t:o Bidders"herebt S
<br /> y attached: If
<br /> this. Proposal:.shall-be,accepted:'by.the City of Everett, Washington; °and::the undersigned shall fail to .execute-a
<br /> I satisfactory contract and bond,,as stated,in°.the Instructions to Bidders hereto attached,within twenty.(20).calendar
<br /> days afterthe award date,then the.City.may,at its option,determ
<br /> inethat the undersigned has;abandoned the.Contract
<br /> and thereupon this Contract shall be null'•and.void and.:the amount:of.tl e.bid.bond or.certified check or cashier's check
<br /> ii accompanying.this Proposal shall be forfeited and become..the property.of the City of Everett,Washington: •
<br /> I
<br /> I • 5/z 42_
<br /> ..4/(7/X
<br /> IINTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS DIVISION P-PROPOSAL
<br /> WORK ORDER 3749 Page P1 of P12 MAY 2,2022
<br /> tided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
<br />
|