Laserfiche WebLink
I <br /> PAGE <br /> I1 Payments 36 <br /> 2 Retainage 37 <br /> I 3 TEMPORARY TRAFFIC CONTROL 38 <br /> 4 Traffic Control Management 38 <br /> 5 General 38 <br /> 6 Measurement 39 <br /> 7 Reinstating Unit Items With Lump Sum Traffic Control 39 <br /> III8 DIVISION 2 <br /> 9 EARTHWORK <br /> I10 CLEARING, GRUBBING,AND ROADSIDE CLEANUP 40 <br /> 11 Payment 40 <br /> I12 Removal of Pavement, Sidewalks, Curbs, and Gutters 40 <br /> 13 2-02.5 Payment 41 <br /> I14 2-03.4 Measurement 41 <br /> 15 DIVISION 4 <br /> 16 BASES <br /> I17 4-04.1 Description 43 <br /> 18 DIVISION 5 <br /> 19 SURFACE TREATMENTS AND PAVEMENTS <br /> ' 20 5-04.3 Construction Requirements 44 <br /> 21 A Mix Design 44 <br /> 22 5-04.3(8)A ACCEPTANCE SAMPLING AND TESTING — HMA MIXTURE 45 <br /> 1 23 5-04.5 Payment 45 <br /> 24 DIVISION 8 <br /> I25 MISCELLANEOUS CONSTRUCTION <br /> 26 EROSION CONTROL AND WATER POLLUTION CONTROL 47 <br /> I27 Construction Requirements 47 <br /> 28 8-01.3(2)D Mulching 47 <br /> I29 8-01.5 Payment 47 <br /> 30 8-04 CURBS, GUTTERS, AND SPILLWAYS 47 <br /> I 31 CEMENT CONCRETE SIDEWALKS 49 <br /> 32 Description 49 <br /> 33 Construction Requirements 49 <br /> 34 Detectable Warning Surface 49 <br /> IINTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS TOC OF THE SPECIAL PROVISIONS <br /> WORK ORDER 3749 C MAY 2,2022 <br />