My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. =.f . '.7 - - <br /> •--.�.-0.,�....,. ..:....,.: .AR1M1174.WA btvisian-11Coiirnfttee� .. • ' rev:'.1 80016 <br /> .`Pr•oposal for Incorporating Recycled Materials tntothe• Proj•ect • � I <br /> In compliance-with.a,n+ew law that went into effect January 1, 2016(SH61695),;the-Bidder shell.• . <br /> . propose below,the"total pereet°of 0nstruct►or a re ate and concrete matet'iais to tie.' .. ' <br /> incorporated into the.Proms that aite recycled matedais Calculated percentages must.t e.withtn • <br /> . <br /> ' the amounts allowed in Section.9-03<21(1)E,Table o•n.Maximum Allowable Percent'(By Weight) <br /> of Recycled:Material, of the Standard Specifications <br /> Pro posed total .percentage. o . .. percent. I <br /> P pe 9 �:t� <br /> Note: Use::of recycled materials is highly,encouraged°within'.the:limits:shown.above;but:does <br /> not constitute:a Bidder Preference,and will not affect the determination of award, unless two or I <br /> more:lowest responsive Bid totals`are exactlyequal, inn•which case proposed recycling <br /> percentages will be used as a tie•breaire per the ARWA GSPin Section:.1:-03:1.of the Special <br /> Provisions: 'Regardless, the Bidder's stated proposed percentages:will become:a`goal the <br /> Contractor should do its best to accomplish 'Bidders will be required.torepott'on recycled I <br /> materials actually incor porated into the Project,'in accordance with the APWA.•GSP in Section <br /> 1-06:6 of the:Special Provisions. M1 i 1 (n',� (-LC- <br /> Bidder;. • `C± .. 5 '. d- �` �� I <br /> Signature.of Authorized Official: <br /> •r <br /> Date: 6.j �1 L.(2..a- I <br /> I• <br /> I <br /> I <br /> I <br /> I <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS DIVISION P—RECYCLED MATERIALS 111 <br /> WORK ORDER 3749 Page P12 of P12 MAY 2 2022 <br /> I <br /> Provided to Rnildere Exnhanae of WA. Tnc- Fnr nsaae Conditions Aaraamant caa www-hxwa.cnm - Always Varifv Scat <br />
The URL can be used to link to this page
Your browser does not support the video tag.