qt <br /> 3.8 SPREAD FOOTINGS <br /> We expect that major load-bearing elements of the 40-58 building structure will be supported by <br /> drilled shafts, as discussed above. However, it may be possible to support some of the building columns <br /> in the southwest portion of the building footprint—where very dense glacial till is present near the ground <br /> surface—on spread footings. (The potential for shallow foundation support at this location, and bearing <br /> capacity recommendations[as appropriate], will be evaluated in the draft version of this report) <br /> Lightly loaded structures, such as retaining walls, tunnel floors and utilidor floors, and the west <br /> and east building walls could be supported by shallow foundations such as isolated or continuous spread <br /> footings. Spread footings may be proportioned for an allowable bearing capacity of 4, 000 lbs per square <br /> foot (psf). This capacity is based upon settlement considerations and the presence of existing medium <br /> dense fill or future fill at these locations. The allowable bearing capacity recommended above may be <br /> increased by one-third for transient wind or seismic loads. <br /> During excavation of lightly loaded footings, loose existing fill subgrade soil will need to be <br /> overexcavated where exposed at the footing subgrade elevation to a depth of two feet below the footing <br /> subgrade and then replaced with structural backfill. If encountered during foundation excavation,wet or <br /> organic-rich soils would need deeper overexcavation and replacement with structural backfill. Structural <br /> backfill should be placed and compacted as described in Section 3.4. <br /> Where overexcavation and replacement with structural backfill is necessary,the plan extent of the <br /> structural fill layer should extend beyond the edge-of-footing a distance equivalent to the depth of the <br /> structural fill. Alternatively, controlled density fill (CDF) or lean concrete could be used as backfill, in <br /> which case the limits of the overexcavation do not need to extend beyond the width of the footing. <br /> During foundation excavation, loose material at an otherwise suitably dense bearing soil should <br /> either be properly recompacted or removed. All soil directly below footings should be compacted to at <br /> least 95 percent of maximum dry density (ASTM D1557) prior to placement of forms, reinforcing steel, <br /> and concrete. <br /> We understand that lateral column loads along the west and east sides of Building 40-58likely be <br /> resisted by the interior floor slab and a pavement apron. For other structures,passive earth pressures that <br /> develop against the sides of foundations, in conjunction with friction developed between the base of the <br /> footings and the supporting subgrade,can be used to resist lateral loads. For design purposes,the passive <br /> resistance of well-compacted fill placed against walls or the sides of foundations may be considered <br /> equivalent to a fluid with a density of 300 lbs per cubic ft. The recommended value includes a safety <br /> factor of about 1.5 and is based on the assumption that the ground surface adjacent to the structure is level <br /> in the direction of movement for a distance equal to or greater than twice the embedment depth. The <br /> recommended value also assumes drained conditions that will prevent the buildup of hydrostatic pressure <br /> 5/16/14 P:\1423\002\010\FileRm\R\Draft Bldg 40-58 Report\Bldg 40-58_draft rpt.dacx INTERIM DRAFT <br /> 3-7 <br />