My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-58 Geotech Report 2022-10-25
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Geotech Report
>
3003 W CASINO RD BLDG 40-58 Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:08:28 PM
Creation date
8/1/2022 10:35:19 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 REVIEW OF DOCUMENTS AND CONSTRUCTION MONITORING <br /> Landau Associates' scope of services includes review of the earthwork and foundation portions of <br /> the design drawings and specifications. The purpose of the review is to verify that the recommendations <br /> presented in this report have been properly interpreted and incorporated in the design and specifications. <br /> We strongly recommend that we be involved in continued discussion with the design team and the <br /> contractor, especially with respect to the anticipated phasing of earthwork operations, foundation <br /> construction,site pad retaining wall construction,and slab-on-grade construction. <br /> We recommend that geotechnical monitoring services be provided during construction. These <br /> services will be especially important because of an expected relatively complex construction phasing,the <br /> important nature of fill pad construction with respect to slab-on-grade performance, construction of <br /> isolated non-redundant drilled shaft foundations, and other geotechnically critical aspects of the proposed <br /> building. The purpose of these services would be to observe compliance with the design concepts, <br /> specifications, and recommendations of this report, and in the event subsurface conditions differ from <br /> those anticipated before the start of construction, provide revised recommendations appropriate to the <br /> conditions revealed during construction. <br /> 5/16/14 P:\1423\002\010WileRm\R\Draft Bldg 40-58 Report\Bldg 40-58_draft rpt.docx INTERIM DRAFT <br /> 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.