• • <br /> C <br /> " I :-; HOFFMAN CONSTRUCTION COMPANY <br /> �.. OF WASHINGTON <br /> 71 BEING-777X PROJECT <br /> EVERETT,WASHINGTON <br /> FIELD QUALITY CONTROL PROGRAM <br /> HYDROSTATIC/PNEUMATIC TEST REPORT <br /> SYSTEM No.: DOMESTIC WATER TEST No.: PROJECT No.: 5050014 LOCATION: SITE: 40-57 SOUTH <br /> SYSTEM <br /> CONTRACTOR: HOSS BROTHERS MID MOUNTAIN JV PREPARED BY: JOHN POWERS DATE: 2/10/2015 PAGE: 1 OF 1 <br /> — - <br /> LINE PIPE PIPE PIPE PRESSURES:psi) DURATION TEST <br /> NO. SIZE MATERIAL LENGTH DESIGN OPER. (ACTUAL START' I STOP. MEDIA '' TEST BOUNDARIES <br /> DUCTILE FROM: SITE 10-INCH MAIN WEST <br /> 1 10-INCH IRON 380 LF 150 PSI 2 HOURS 260 PSI 9:17 11:17 WATER <br /> TO: SITE 10-INCH MAIN EAST <br /> DUCTILE FROM: SITE 10-INCH MAIN <br /> 2 8-INCH IRON 60 IF 150 PSI 2 HOURS 260 PSI 9:17 11:17 WATER <br /> TO: 40-57 BUILDING 8-INCH SERVICE <br /> DUCTILE ry WATER FROM SITE 10-INCH MAIN <br /> 3 4-INCH JRQN 20 LF 150 PSI 2 HOURS 260JS1 9:17' 11:17 e_- <br /> TO. 40-58 BUILDING 4-INCH SERVICE �. <br /> FROM: <br /> TO: <br /> FROM: <br /> TO; <br /> FROM: <br /> TO: <br /> TEST RESULT: PASSED WITNESSED: JOHN POWERS!CAM KRIER DATE TESTED: 2/10/2015 <br /> GAUGES: NOTE:JOHN POWERS/CAM KRIER WITNESSED THE TEST START,BUT JOHN HAD TO LEAVE SITE. 2 HOUR TEST <br /> (M&TE ID Nos.and Cal.Due Dates) TEST COMPLETION WAS WITNESSED BY CAM KRIER:. <br /> _ . _ _ <br /> TEST ACCEPTED <br /> TEST SUPERVISOR J.Ia�.S{ r7 QC INSPECTOR: `' 'p(vita CLIENT REP.: , ,,.,,,---4, <br /> CHRIS WILLIAMSON-HBMMJV J i. N POWERS-HOFFMAN CAM KRIER-JACOBS <br /> QCM-H-14-04 <br /> Page 1 of 1 <br />