Laserfiche WebLink
.7./7) <br /> HOFFNIAN CONSTRUCTION STRUCTION COMPANY <br /> ID OF WASHINGTON <br /> BOEING — 777X PROJECT <br /> EVERETT, WASHINGTON <br /> FIELD QUALITY CONTROL PROGRAM <br /> HYDROSTATIC /PNEUMATIC TEST REPORT <br /> SYSTEM No.: Domestic Water TEST No,: • PROJECT No.: 5050014 LOCATION: SITE: 40-58 <br /> CONTRACTOR: HOSS BROTHERS MID MOUNTAIN JV PREPARED BY: Chris Williamson DATE: 1/12/2016 PAGE: 1 OF 1 <br /> LINE PIPE PIPE PIPE PRESSURES(psi) DURATION TEST <br /> NO. SIZE MATERIAL LENGTH DESIGN OPER. ACTUA START STOP. MEDIA TEST BOUNDARIES <br /> L <br /> 2.419\P FROM:LIN PAD Re-Route <br /> 1 10-INCH Ductile 260' 80 PSI 1 HR.. 5:00 6:00 Water <br /> IronPSI TO: <br /> FROM: <br /> TO: <br /> FROM: <br /> e <br /> TO: <br /> FROM: <br /> TO: <br /> FROM: <br /> TO: <br /> FROM: <br /> TO: <br /> TEST RESULT: WITNESSEr JOHN POWERS DATE TESTED: 7/1/2015 <br /> D:: <br /> GAUGES: <br /> (M&TE ID Nos.and Ca).Due Dates) <br /> TEST ACCEPTED <br /> TEST SUPERVISOR: 11:40/1146•49 QC CLIENT REP.: <br /> �� INSPECTOR: <br /> Chris Williamson HBMMJV 1 OHN POWERS-HOFFMAN CAM KRIER-JACOBS <br /> QCM-H-14-04 <br /> Page 1 of 1 <br />