Laserfiche WebLink
• <br /> HOFFMAN CONSTRUCTION COMPANY <br /> OF VVASHINGTON' <br /> MidMountain BOEING —Static Te <br /> sting Project <br /> BROTHERS contract M�. EVERETT,WASHINGTON. <br /> FIELD QUALITY CONTROL PROGRAM <br /> HYDROSTATIC:I PNEUMATIC TEST REPORT <br /> SYSTEM No.: Domestic Water System TEST No.: PROJECT No.: 5050014 LOCATION: Site:40-57 South <br /> • CONTRACTOR: HOS BROTHERS MID MOUNTAIN JV PREPARED BY: Chris Williamson DATE: 6/18115' PAGE: 1 OF 1 <br /> LINE PIPE PIPE PIPE PRESSURES(psi) DURATION TEST <br /> NO, SIZE MATERIAL LENGTH DESIGN OPER. ACTUA START STOP. MEDIA TEST BOUNDARIES <br /> L <br /> FROM:Site 10-inch water main <br /> 1 4-Inch Ductile <br /> 20 LF- 150 PSI 2 Hours Psl 9:17 11:17 Water <br /> Iron TO:40-58 Building 4-inch service <br /> FROM: <br /> TO: <br /> FROM: <br /> TO: <br /> FROM: <br /> TO: <br /> FROM: <br /> TO: <br /> FROM: <br /> TO: <br /> TEST RESULT: Passes WITNESSED: Cam Krier DATE TESTED: 6118/15; <br /> GAUGES: <br /> (M&TE ID Nos.and Cal.Due Dates) <br /> TEST ACCEPTED <br /> TEST SUPERVISOR: QC CLIENT REP.: <br /> INSPECTOR: <br /> HBMMJV HOFFMAN Boeing"Rep <br /> QCIVI-H-14-04 <br /> Page 1 of 1 <br />